1 / 18

Forest Carbon Partnership Facility

Forest Carbon Partnership Facility. Evolution of FCPF Readiness Plan Concept: Early Lessons and a Path Forward. Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009. Outline and Rationale. Outline of presentation: Issues and lessons from “R-Plan” process

jeri
Télécharger la présentation

Forest Carbon Partnership Facility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Forest Carbon Partnership Facility Evolution of FCPF Readiness Plan Concept: Early Lessons and a Path Forward Participants Committee Meeting (FCPF PC3) Montreux, Switzerland June 16-18, 2009

  2. Outline and Rationale • Outline of presentation: • Issues and lessons from “R-Plan” process • Proposal for a path forward. • Learning from 3 early-actor R-Plans: • FCPF R-Plan template invented to identify information needed. • Holistic concept of R-Plan is challenging: • Countries newly encouraged to look across sectors, ministries, issues. • 3 R-Plan submissions  insights about what countries can provide, and what FCPF needs. • FCPF is a Partnership: We are all learning together.

  3. Early Lessons on R-Plan Template • Countries desire simpler template. • Harmonize with UN-REDD. • Title “R-Plan” raises expectations that a full plan is ready, when countries really presenting a proposal • Shift to planning document that identifies funding priorities and timing –- to enable funding decisions. • 18 review criteria difficult to operationalize. Are these the right criteria? • Terms of Reference not always actionable. • Role of the PC, the Bank, and the TAP still evolving.

  4. Early Lessons on R-Plan Content • Assessment of deforestation drivers not yet adequate to inform REDD strategy choices. • Additional studies needed in Readiness phase. • Reference scenario, monitoring, REDD Implementation Framework, etc. proposed activities and ToRs still need further elaboration. • Countries need funding for studies to advance thinking. • Substantial consultations needed with representative stakeholders during writing of the R-Plan. • Overly high expectations, given that country’s REDD strategy still needs to be decided. • Thus, consultation needs to be phased in, and continuous. • Timing and application of World Bank Safeguards not yet clearly understood (discussed later in presentation).

  5. FCPF Partnership of 37 Countries with Varying Forest & Development Contexts How to define what R-Plan should contain for each?

  6. Implications for Assessment of Early R-Plans • Thus, assessing first R-Plans is challenging: • Each domestic & international stakeholder group seeks to meet its global expectations for REDD via first country R-Plan. • What does an R-Plan need to accomplish ? • Key issue: How much information, consultations, etc. necessary for early preparation for REDD Readiness ?? R-PIN Current “R-Plan” Achieving Readiness How Much Consultation? How Specific REDD Strategy?? WHERE TO BE ?? Not Enough Info.? Perfect Information?

  7. Role of PC in Reviewing R-PP • Provision under the Charter: “REDD Country Participant shall, on the basis of the Readiness Plan Idea Note, develop a Readiness Plan and submit it to the FMT for review and approval by the PC.” • Implication of the word “approval”: - Giving formal sanction or confirming authoritatively • But, the action of “approval” does not accurately reflect experiences of Readiness preparation process.

  8. A Proposal for Moving Ahead: R-Preparation Proposal onto R-Package • “Readiness Preparation Proposal” focuses on 4 key building blocks + what is knowable now. • Includes request for funding of activities. • Full “Readiness Package” details come later, when known. • Allows time & funding for consultations & progress on most topics. • Harmonizes with UN-REDD as feasible. Readiness Package: Full description of Readiness R- Preparation Proposal

  9. ToR & R-PP WORK Proposed: R-Preparation Proposal Leads to Readiness Package R- PP R – Package; Achieving Readiness R-PIN Framework consultations > ORGANIZE & CONSULT > Broad General REDD STRATEGY Specific REFERENCE SCENARIO NATIONAL MONITORING SYSTEM

  10. Advantages of Proposed R-PP • Acknowledges countries not ready to fully describe REDD activities • Strives to start funding REDD analytic work to inform country’s REDD strategy development, reference scenario, etc. • Readiness Package remains the major product of Readiness process • Establishes need for consultations up front: • Starts with framework consultations with representative groups of stakeholders, and stakeholder analysis … • Then broadens and deepens over time.

  11. Progress on Harmonization with UN-REDD • FCPF & UN-REDD actively working to harmonize, per PC request • Goal is to simplify what a country needs to produce • Propose 4 key common components: • Organize and Consult • • REDD Strategy • Reference Scenario • National Monitoring System • • + Budget & Schedule; Program Monitoring & Evaluation • Propose common budget sheets • Drafting common Consultation Guidance

  12. Proposing Harmonization with UN-REDD FCPF –PP for National REDD Activities Organize and Consult UN-REDD NJPD (for Funding and Administration) FCPF Grant Agreement (for Funding and Administration) REDD Strategy/ Priority Setting Reference Scenario National Monitoring System Review by Expert Panel drawn from Common Roster of Experts

  13. Working to Clarify How and When World Bank Safeguards Apply • PC discussion in Panama asked: • When do WB Safeguards apply, at what stage? • How will they be applied, e.g., for consultation? • Bank internal discussions suggest: • Build on international good practices for consultations, environmental and social safeguards • Reviewing how WB Safeguards apply to FCPF stages, suggesting: • Development of overarching frameworks first, then • More specific Safeguards applied once the REDD strategy and activities become known.

  14. Potential Next Steps: 1 • Discussion by PC • If R-PP approach accepted, FMT revises R – PP template for new submissions • 3 submitted R-Plans are grandfathered in ? • Training and tech assistance

  15. Potential Steps 2: Role of PC in Reviewing R-PP Recommendations, in light of this R-PP proposal: 1) Review and assess the 3 existing R-Plans on the basis of the criteria proposed in Program Note (FMT2009-1 Rev.4 on “Review and Assessment of Readiness Preparation Proposals”; Make recommendations for areas for improvement; Determine whether an R-PP provides a sufficient basis to proceed with a Readiness Preparation Grant (up to US$3.6 million) 2) Consider the applicability of the existing Program Note criteria for any new R-PP proposals.

  16. Potential Steps 3: Training and Tech Assistance • Propose: R – PP training event: • Tentatively July • Via Skype and Video Conference from World Bank offices • Ask 3 countries with submitted R-Plans to share their experience & process with others • FMT and TAP experts walk through major components • Record event for later use by FCPF countries? • Propose: Regional Workshops? • AFRICA, SE ASIA, LATIN AMERICA? • August to December, as feasible?

  17. Potential Steps 4: Training and Tech Assistance? (2) • Coordinate or provide technical assistance, as feasible. • Potential examples: • REDD strategy development • Deforestation and opportunity cost analysis • Reference scenario development • National Monitoring System design • Distributive aspects of REDD • National REDD registry • Cooperate with international organizations (FAO, UNDP, UNFCCC, CfRN, etc.) • Regional collaboration, sharing of experiences in R-Plan formulation

  18. Thank you!