Experiences with the implementation of EC legislation on shipment of waste Findings from previous events

2. Topics identified in previous events. Major Problems and deficits Examples for good practice Proposals for action at EU levelSpecific Experiences from MS. 3. Major problems and deficits identified by authorities. Problematic waste streams: WEEE, ELV, waste tyres, waste cables, MSWShipments to

jovan
Télécharger la présentation

Experiences with the implementation of EC legislation on shipment of waste Findings from previous events

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. 1

    2. 2 Topics identified in previous events

    3. 3 Major problems and deficits identified by authorities Problematic waste streams: WEEE, ELV, waste tyres, waste cables, MSW Shipments to Africa and Asia; (Shipments to new MS) Lack of precision in waste definition within the WFD / Classification: product / good or waste Cooperation at national level between authorities involved Cooperation with other Member States and third countries Diverging standards for quantification of controls and reporting Disagreement on classification issues Information of local/regional environmental authorities/inspectorates on notifications expected transports Limited timeline for custom offices to detain cargo The existence of concurring classification systems

    4. 4

    5. 5

    6. 6

    7. 7 Potential priority tasks for cooperation at European level

    8. 8 Potential priority tasks for information and cooperation at national / local level

    9. 9 Priorities for effective controls

    10. 10 Major problems as identified by industry in Spain High administrative burden for waste shipments within EU Excessive time needed for notification process Identification of producers in case of multiple producers Fixation of routing and actual date of shipment in movement documents The required validity of the financial guarantee (until certification of final treatment) Requirements regarding detail and height of financial guarantees Renewal of notification after 1 year

    11. 11 Major tasks for Implementation at national level as identified in Germany