The E951 Targetry Program

Explore alternatives for high-power proton targetry in the E951 program at CERN, considering thermal management, radiation damage, and high peak power requirements.

jstaley
Télécharger la présentation

The E951 Targetry Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The E951 Targetry Program Targetry Meeting CERN September 19, 2003

  2. Interest in High-power Proton Drivers • High average power—SNS • Thermal management • Radiation damage • High peak power—NLC, Superbeams, NUFACT • Thermal management • Radiation damage • Thermal shock

  3. Superbeams • Carbon is a good target candidate • Higher momentum pions • Stationary target up to 1.5 MW • Good thermal properties • Low energy deposition densities 28 GeV Proton Beam

  4. Neutrino Factory • Maximize Pion/Muon Production • Soft Pion Production • Higher Z material • High energy deposition • Prone to target dissipation • High Magnetic Field

  5. High-Z Materials • Key Properties • Maximal soft-pion production • High pion absorption • High peak energy deposition • Potential for extension beyond 4 MW (liquids) • Key Issues • Jet dynamics in a high-field solenoid • Target disruption • Achievement of near-laminar flow for a 20 m/s jet

  6. E951 Hg Jet Tests • 1cm Diameter Hg Jet • 24 GeV 4 TP Proton Beam • No Magnetic Field

  7. CERN/Grenoble Hg Jet Tests • 4 mm Diameter Hg Jet • v = 12 m/s • 0, 10, 20T Magnetic Field • No Proton Beam A. Fabich, J. Lettry Nufact’02

  8. High Field Pulsed Solenoid • 70o K Operation • 15 T with 4.5 MW Pulsed Power • 20 cm warm bore • 1 m long beam pipe Peter Titus, MIT

  9. Pulsed Solenoid Performance • 5T Peak Field with 2 inner coils; 540 KVA ; 80O K • 10T Peak Field with 2 inner coils; 2.2 MVA PS; 72O K • 15T Peak Field with 3 coils; 2.2 MVA PS; 30O K • 15T Peak Field with 3 coils; 4.4 MVA PS; 70O K

  10. Cryogenic Performance LN2 Pool Boiling LN2 Forced Flow

  11. Battery Power Supply R&D Battery/Charger 12V 1400A Mech. Switch 1500V 1600 A Load Mechanical Switch capable of 4.4 MW Pulsed System IGCT 600V 4000A

  12. Future E951 Running • We plan to resume E951 running at the AGS. • But DOE HEP support has been terminated for FY03 and will likely remain so for FY04 and FY05. • We need to explore • alternatives.

  13. Alternative Running • Alternatives for targetry running: