An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Subpart TDemolition These handouts and documents with attachments are not final, complete, or definitive instruments. This information is for guidance purposes only. You should independently verify and satisfy yourself as to its accuracy. The AHBSIF does not assume any liability for damages arising from the use of this information or exhibits and attachments thereto and renders no opinion that any of the terms, conditions, and/or cited federal standards in this document and the exhibits and attachments should be explicitly followed by the fund member. Seek specific guidance from the appropriate regulator (OSHA) or professional advisor.

  2. Most common Demolition Citations • No Engineering Survey • No hazard or utilities identification • No exterior chutes • No canopy for entrances

  3. Types of Structures Covered by the Standard • Chimney, Stack, Silo, or Cooling Tower • Pre-stressed Concrete Structures • Pre-cast Units Stressed Separately from the Main Frames • Monolithic Structures • Progressively Pre-stressed Structures • Confined Spaces

  4. Demolition Preparation • Engineering Survey • Utilities Location • Medical Services • Police and Fire Contact

  5. The Engineering Survey • Survey is required by OSHA 1926.850(a) • Survey determines the condition of framing, floors, and walls to prevent premature collapse of any portion of the structure. • Helps the contractor plan the job • Methods of Wrecking (equipment needed) • Man Power • Protection of the Public

  6. Utilities Location • Alabama One Call 1-800-292-8525 or 811 • Must call at least 48 hours in advance • Service is available Monday through Friday, 7:00 am to 5:00 pm • All utilities are marked in a standardized color code

  7. Medical Services and First Aid • Provisions should be made for prompt medical attention • Make sure first aid kits are properly stocked and accessible • Emergency phone numbers should be readily accessible

  8. Shoring and Bracing • Brace or shore walls and floor structures that have been damaged and may require employee entry. • No work is permitted where structural collapse hazards exist until they are corrected by shoring, bracing, or other effective means. • Demolition of exterior walls and floors must begin at the top of the structure and proceed downward. • Structural or load-supporting members on any floor must not be cut or removed until all stories above that floor have been removed.

  9. Fire Prevention and Protection • A fire plan should be established prior to demolition. • Fully charged portable fire extinguishers should be provided throughout the operation. • Electrical wiring and equipment for providing light, heat, or power should be installed by a competent person and inspected regularly. • Local fire departments are often willing to assist in pre-demolition structure assessments.

  10. Extinguishers Ordinary Combustibles Includes materials such as wood and paper Flammable Liquids Includes fuels, grease, other liquids Electrical Fires Contains non-conductive smothering agent

  11. How to Use a Fire Extinguisher P-A-S-S Pull -- Pull the pin at the top of the extinguisher that keeps the handle from being activated Aim -- Aim the nozzle at the base of the fire Squeeze -- Maintain a distance of eight to ten feet away from the fire and squeeze the handle. Discharge will only occur if the handle is being squeezed. Sweep -- Sweep the nozzle back and forth at the base of the fire until it appears to be out.

  12. Demolition Checklist • Make sure workers are using the right PPE for the job (noise & dust exposures) • Dispose of all materials properly • Insure that workers are not exposed to energized power sources • Educate workers on the special hazards they may encounter (lead paint) • Educate workers on the application and use of fall protection