An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ECN3forthcoming activities07/09/2010 Francois BUTIN CERN EN/MEF

  2. MNP33 re-installation

  3. MNP33 re-installation • Support blocs / rails grouting and levelingCivil engineering / surveyors : 13 – 27 Sept • Magnet re-assembly with grey tube section: Dubna team + PH/DT: 11 Oct – 5 Nov • Piping adaptation: extend cooling pipes to new location. EN/CV, date to be confirmed • Water and power connection EN/EL, EN/CV, PH/DT • Tests: PH/DT

  4. 8 8 4 8 8 8 8 8 4 16 8 4 16 8 4 8 8 8

  5. Blue tube refurbishment

  6. Blue tube removal of inner structures • 3 sections are concerned

  7. Internal wall to be removed

  8. Internal wall to be removed Brackets to be removed

  9. Feet cut-out for flange access

  10. Blue tubes refurbishment After cutting, grinding etc. • General cleaning, inside and outside (probably with dry vapor, test to be carried out soon) • Paint touch-ups. Paint type being investigated (paints for space applications possibly) • Re-installation of tube sections at (or close to) their final location

  11. Conclusion:Infrastructure related activities (Automn 2010) • Launch Market Survey for beam dump (September), then Call for Tender (November) ECN3 9 m 2,8 m 2 m Carbon Iron Concrete

  12. Conclusion:Infrastructure related activities (Automn 2010) • Launch Market Survey for beam dump (September), then Call for Tender (November) • Install Fire doors at bottom of PPG galleries (October) • MNP33 re-assembly (Sept-Oct) • Blue tube sections refurbishment (Oct-Nov) • Upgrade ECN3 40t crane with radio control (December)