An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PNPI activitiesStatus and Plans Outline status ofHV-system, recalibration in situ Status of Muon chambers Plans Oleg Maev

  2. UF/PNPI HV-system PNPI test stand was improved. Some manuals, mapping sheets, etc. were prepared also. Oleg Maev

  3. UF/PNPI HV-system Recalibration in situ (from Evgeny): Done: • Remote control of MATSUSADA with RS-232 serial port was realized. • CMS SW for calibration was investigated and partially adapted for LHCb. • Driver was little bit corrected. • Calibration of Voltage sensors was realized in prototype version on test stand for single RDB module. To be done: • Continuing work with adaptation of packet of CMS SW to the LHCb requirements. • Developing of calibration of Master modules and implementation it in the program packet (absent in CMS SW). • Realization of voltage sensors monitoring SW. • Moving and installation SW on PC in the PIT. • Organizing of DB for calibration files and developing of user friendly interface and probably some instruments for analysis of data. • Changing Primary PS control from serial port to USB interface, if it is needed. That is special nontrivial task. Oleg Maev

  4. UF/PNPI HV-system. Status of voltage sensors. Test 28.11.08 HV on premier PS =2,5 kV, Vset=2,7kV Oleg Maev

  5. Status of Muon chambers • In total (99,8 % - OK): • 3 Gaps are disconnected because of short circuits. • 2 Gaps have a dark current depending from humidity. • 1 Gap has a dark current, under training. • 5 Gaps have a sparks of unknown nature. Oleg Maev

  6. Plans for 2009 Main goal: Supporting the Muon system in a best shape. Tasks for a beginning of next year: • HV&MWPC --- baby-sitting on HV and chambers as usual, finishing of work with SW for recalibration in situ. (Evgeny ~2-3 months). • Inspection and repairing of masked channels on M2-M5. • Changing of chambers with short circuits and may be with dark current. • Testing of PNPI spare chambers with electronics (Neustroev and Bochin). • Helping in M1-chambers installation, testing, etc., when it is needed. Oleg Maev

  7. Oleg Maev