1 / 22

News from ELAN

News from ELAN. SC of CARE Paris Sept 5 2005. News from ILC. GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’ Snowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration

kiri
Télécharger la présentation

News from ELAN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. News from ELAN SC of CARE Paris Sept 5 2005

  2. News from ILC • GDE structure founded under B. Barish: 3 GDE regional Directors + ~40 CORE team (4 from ELAN managt) under ILCSC ‘oversight’ • Snowmass meeting (ALCPG->Intal) 2 weeks in August to reach ILC configuration - Physics (Aspen), Detector, Accelerator (after KeK) - 640 participants (1/3 machine) - 10 critical recommendations/decisions • EUDET: I3 for detector approved 7 M€ 21 partners

  3. GDE – Staffing • Staff the GDE • Administrative, Communications, Web staff • Regional Directors (one per region) • Accelerator Experts (covering all technical areas) • Senior Costing Engineer (one per region) • Civil/Facilities Engineer (one per region) • Detectors (WWS chairs) • Fill in missing skills (later) • Total staff size about 20 FTE (2005-2006) about 40 heads. • The internal GDE organization and tasks will be organized internationally, not regionally

  4. GDE – Near Term Plan • Schedule • Begin - define Configuration (Snowmass Aug 05) • Baseline Configuration Document (end of 2005) ----------------------------------------------------------------------- • Baseline under Configuration Control (Jan 06) • Develop Reference Design (end of 2006) • Coordinate the supporting R&D program • Three volumes -- 1) Reference Design Report; 2) Shorter glossy version for non-experts and policy makers ; 3) Detector Concept Report

  5. 2005 2006 2007 2008 2009 2010 Global Design Effort Project LHC Physics Baseline configuration Reference Design The GDE Plan and Schedule Technical Design ILC R&D Program Bids to Host; Site Selection; International Mgmt

  6. ELAN and ILC • Support relevant for European WS with acknowledgement of ELAN support (logo) Document(s) ELAN issued • List in http://esgard.lal.in2p3.fr/Project/Activities/Current/Networking/N2/ELAN/Workshops/ • Support for international (ILC) meetings: LCWS05 (MDI, ACCEL)+SNOWMASS

  7. Workshops Supported by ELAN

  8. Main decisions/recommendations

  9. Polarized e+/e- source based on Compton back scattering Frank Zimmermann, CERN LP05 • highly polarized e+ and e- (>90%); • generation decoupled from collider T. Omori, J. Urakawa, KEK K. Moenig, A. Variola, F. Zomer, LAL P. Raimondi Frascati to 5 GeV ring J. Urakawa ~100 MeV Accumulator Ring pol. e+ 1.3GeV S-band linac to 5 GeV ring 180 m laser-Compton ring ~100 MeV Accumulator Ring pol. e- ATF proof-of-principle experiment produced ~104 pol. e+ per pulse accumulate >100 bunchlets to make nominal bunch; →needs large-acceptance accumulator ring & fast cooling

  10. Cavity shape/material/processing • Summary Talk London (L. Lilje) https://ilcsupport.desy.de/cdsagenda/askArchive.php?base=agenda&categ=a0522&id=a0522s53t3/transparencies/Summary_of_SRF_WG_LL_.pdf • BCD Proposal for Cavity preparation (short) http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/WG5/helen_edwards20050821164419.ppt • BCD Proposal for Cavity preparation (long) http://alcpg2005.colorado.edu:8080/alcpg2005/program/accelerator/WG5/helen_edwards20050819140512.ppt

  11. Next steps • European GDE meeting in Oxford • GDE meeting in Frascati to finalize decisions for the baseline -> ELAN support is asked by the B. Foster • Prepare for FP7 • Contribute to ILC outreach (presentation L. Lilje at Cornell & Snowmass)

  12. Outreach and Tutorials supported ELAN • Snowmass SRF Cavity tutorial (L. Lilje) http://alcpg2005.colorado.edu:8080/alcpg2005/program/ENO/Superconductingcavitiestutorial_new.pdf • Srf Tutorials at SRF 2005 Workshop WWW-Link: http://www.lns.cornell.edu/public/SRF2005/ • Tutorial session on Sunday: http://www.lns.cornell.edu/public/SRF2005/program.html • Especially talk by D. Reschke on cleaning (paid by ELAN): http://www.lns.cornell.edu/public/SRF2005/talks/sunday/SuP03_talk_srf2005.pdf

  13. ELAN Management • New adsociates - US: SLAC (M. Ross) - Technion (S. Tarem) - Center for the Advancement of Natural Discoveries using Light Emission, Yerevan , Armenia - Cracow University of Technology, (Institute of Applied Mechanics), Krakow, Poland - University of Ankara (K. Ciftci) • Support ICFA school on ILC ? • ANAD has launched a NEST proposal 1st level selection EUROLEAP:European Laser Electron controlled Acceleration in Plasmas to GeV energy range

  14. HEEAUP 2005 Paris

  15. ELAN Documents

  16. Conclusion • ELAN activity is mainly driven by the international GDE (WG 3-4) • ELAN support has been instrumental in preparing and supporting the Snowmass meeting • European support has been essential and should be maintained within FP7 • Interesting prospects of collaboration with the laser-plasma community

  17. From ECFA (T.A.) • ICFA beam dynamics panel, Weiren Chou, European co-sponsoring of a linear collider (more specifically ILC) school in spring 2006 in Japan. He has contacted Japan (JSPS) and the USA (DOE) about co-sponsoring and sent a mail to T.A. about "which European agency to contact". Quantitatively we talk about 40-55'000 euros, assuming 20-25 students and 6-8 lecturers from Europe.

  18. Cornell WS Snowmass Snowmass+Report Doc-05-09

  19. London+Snowmass Report expected Paris meeting Euroleap

More Related