1 / 5

“Costa Concordia” tragedy – ship displacement monitoring system

“Costa Concordia” tragedy – ship displacement monitoring system.

kyle-lara
Télécharger la présentation

“Costa Concordia” tragedy – ship displacement monitoring system

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “Costa Concordia” tragedy – ship displacement monitoring system On 13/01/2012 at Giglio island a 400 long ship “Costa Concordia” having about 4000 people on board shipwrecked. Since then, it has been constantly moving downward the sea bottom. Additionally, the unusual ship position, the weather conditions and the rescue operations impose on the construction additional forces, not taken into consideration in its engineering design, which may consequently jeopardize the rescue teams and the environment. Aiming maximal safety of the rescue operations, continuous monitoring of the ship displacement has been launched. This tragedy results to analysis about the preparation and the possibility of adequate crisis reactions. The presentation reveals the ship displacement monitoring system, putting into practice MIMO radar interferometer – a scientific work of the Joint Research Centre - Italy and personal impressions of the ship rescue activities

  2. Protezione civile Information flow Information flow • Displacement bulletin /every 12h, next 24/ • Emergency monitoring in dangerous situations /every 2h/ pompieri Monitoring center Guardia di finanza Private companies army Mutual funds Guardia foresteria insurances Greenpeace volunteers press

  3. The only one experimental device 1 1 Phase interferogram, displacement vs. the reference point m internet n target CW chirp, 2sm wavelength, 2sec acquisition Full Remote control and monitoring reference

  4. Major Faced problems • “on line” programming • -Fast programming on various task, • Continuously changing requirements • Bug fix • Writing/changing own standards • New signal processing • Computational problems • Rapid prototyping • Changing something in the hw, requires changing the software • Physical reinforcement results presentation to the end user • Team work • 24h stand by • Solving problems without team information  • Resource sharing everybody helps with cameras, internet, information about the typical wind conditions etc. • Visibility • -press • papers • presentations

  5. From -…… - TO No time, everything calculated on hand and by eye  End user happy , clear visibility Data format changing, new software, , Title of figure, points of observation 

More Related