1 / 18

Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m

L’esperimento ATLAS ad LHC. 2007-Luglio 2008 : Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Settembre-novembre 2008 : Prime Collisioni ad LHC, inizio presa dati. ATLAS superimposed to the 5 floors of building 40. Diameter 25 m Barrel toroid length 26 m

Télécharger la présentation

Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. L’esperimento ATLAS ad LHC 2007-Luglio 2008: Fine Installazione e Commissioning dei rivelatori con i raggi cosmici Settembre-novembre 2008: Prime Collisioni ad LHC, inizio presa dati ATLAS superimposed to the 5 floors of building 40 Diameter 25 m Barrel toroid length 26 m End-cap end-wall chamber span 46 m Overall weight 7000 Tons Huge experiment Consiglio di Sezione Anna Di Ciaccio

  2. AToroidal LHC AppartuS (ATLAS) DETECTOR Stand-alone Muon Spectrometer, s/pT 10% at 1 TeV/c EM Calorimeters /E  10%/E(GeV)  0.7% Hadron Calorimeters, /E  50% / E(GeV)  3% Full coverage for ||<2.5 Inner Detector: Si Pixel and strips (SCT) & Transition radiation tracker (TRT) s/pT 5 10-4 pT (GeV)  0.001 Good impact parameter res. (d0)=15m@20GeV 4 Magnets: solenoid (Inner Detector) 2T, 3 air-core toroids (Muon Spectrometer) ~0.5T 35 Consiglio di Sezione Anna Di Ciaccio

  3. Seguono Alcune foto .. l’esperimento dopo la chiusura non si potra’ piu visitare ... Consiglio di Sezione Anna Di Ciaccio

  4. 2007: ATLAS side A (with the calorimeter end-cap fully retracted) Barrel Toroid+Calorimetry+Inner detector Forward Calorimetry Consiglio di Sezione Anna Di Ciaccio

  5. June 28 2007:installation of the pixel detector with central beam-pipe Consiglio di Sezione Anna Di Ciaccio

  6. Inner detector: TRT drift tubes+Silicon tracker+Pixel detector Consiglio di Sezione Anna Di Ciaccio

  7. TODAY detector status (central) Endcap Toroid Small Wheel Barrel Calo Endcap Calo Beam Pipe

  8. 2008: Center of activities (ATLAS control room)The control room is operational and used during the cosmic ray commissioning runs Steinar Stapnes

  9. 2008 :Detector commissioning using cosmic rays • Commissioning: from “just installed” to “ready for physics” using cosmic rays • make the detector running: • from low-level (finding dead/hot channels, mapping mistakes, cabling problems) to high-level (integration of sub-detectors into global ATLAS DAQ) • understand the detector: • from alignment and calibration to debugging offline reconstruction software and simulation Consiglio di Sezione Anna Di Ciaccio

  10. A cosmic ray through the barrel muon system Purple crosses: RPC trigger hits Red dots : MDT precision measurement Steinar Stapnes

  11. An other cosmic ray through the barrel muon system

  12. Commissioning with Cosmic Rays :Good quality data from MDT muon precision chambers MDT very good track quality: - 6 hits per track - Residuals centered at 0 - Residuals RMS ~160 mm

  13. RPC and LVL1 monitoring with cosmics N° of hits per events Cluster Size distribution per phi and eta panels Time-Trigger Time w.r.t. strip along sector Trigger Road in Phi view

  14. Anagrafica ATLAS 2007> sostituire con la nuova anagrafica Roberto Di Nardo dott 100 Andrea Di Simone AssRic 100 9.00 7.1 Consiglio di Sezione Anna Di Ciaccio

  15. Richieste ATLAS ... Dal DB dei preventivi Consiglio di Sezione Anna Di Ciaccio

  16. Attivita’ Gruppo Roma2 nel 2009 • Nel 2009 il gruppo di Roma2 sara' impegnato nelle seguenti attivita' • Completamente Commissioning degli RPC in caverna durante lo shutdown gennaio- marzo 2009 • Analisi dei primi dati raccolti in settembre – novembre 2008 • Fisica Standard Model (misura sezione d’urto W,Z) 1 tesi di laurea specialistica • Ricerca del bosone di Higgs4 leptoni -> 1 tesi di dottorato • Goal di fisica di ATLAS per il 2009 • Migliore comprenzione della calibrazione dei rivelatori attraverso misure di processi di Standard Model noti • Zll,W->lv,ttbar, jets etc • Ricerca di nuova fisica Consiglio di Sezione Anna Di Ciaccio

  17. Farm INFN-GRID ROMA Tor Vergata • L`architettura della Farm è quella di un cluster di macchine eterogenee: • 1 Computing Node: Dual Xeon 2.4Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI • 1 Storage Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 36Gb Linux Raid 1 SCSI • 1 Worker Node: Dual Xeon 2.4 Ghz, 512Mb Ram, 100Gb Linux Raid 0 SCSI • 5 Worker Nodes: Dual Xeon 2.4 Ghz, 1000Mb Ram, 110Gb SCSI • 5 Worker Nodes: Dual Xeon 3.2 Ghz, 4000Mb Ram, 180Gb SATA • 1 Worker Node: Dual Xeon 3.0 Ghz, 2000Mb Ram, 140Gb SATA • 1 Worker Node: Opteron 2.4 Ghz, 3000Mb Ram, 160Gb SATA • 1 Worker Node: WoodCrest 2.0 Ghz, 4000Mb Ram, 150Gb SATA • 1 Network Attached Storage Opteron: 1,9TB Raid5 with Spare • 2 Gigabit switch, ZyXEL, 16 ports + 1 Gigabit switch, D-Link, 8 ports, No Rack Mount ( tot:40 ports Gigabit ). • 3 KVM switch 8 ports: ( tot: 24 ports ) D-Link. • 5 UPS APC Smart-UPS 750 Rack Mount for Power Supply Protection. • Totale di “core” ( 1 Node ~ 4 core ) per calcolo = 54 • Totale della capacità disco sicuro =1.9 TB. • Nel 2009 si chiedono altri 2 biprocessori (rinnovo vecchio hardware) e 1TB di spazio disco Consiglio di Sezione Anna Di Ciaccio

  18. INFN-Roma2-GRID dal DB dei preventivi ConsigliodiSezione Anna Di Ciaccio

More Related