1 / 20

Expanded Public Works Program – Overview

Expanded Public Works Program – Overview. Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of Public Transport, Roads and Works 6 May 2008. GAUTENG EXPECTATIONS. Innovation = Business Unusual. Origin.

louie
Télécharger la présentation

Expanded Public Works Program – Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Expanded Public Works Program – Overview Mr. Gilberto Martins B Arch [ Wits] MI Arch Arch SA Deputy Director General: Public Works Gauteng Department of Public Transport, Roads and Works 6 May 2008

  2. GAUTENG EXPECTATIONS

  3. Innovation = Business Unusual

  4. Origin Origin in Growth and Development Summit [GDS] of 2003 Four themes adopted one of which was ‘More jobs, better jobs, decent work for all’ 4

  5. The GDS agreed that the EPWP ‘can provide poverty and income relief through temporary work for the unemployed to carry out socially useful activities. The EPWP will be designed to equip participants with a modicum of training and work experience, which should enhance their ability to earn a living in the future.’ The GDS specified that the EPWP must be “large enough to have a substantial impact on employment and social cohesion, especially for young people, women and the rural poor” . 5

  6. Roads Pavement Forum (RPF) • “Serves as a forum for the exchange of information and technologies, promoting best practice and to facilitate the discussion of issues of strategic importance to the road construction industry”

  7. Social Considerations Economic Consideration

  8. EPWP is integrated methodology where by : • Creation of assets (infrastructure provision and maintenance) • Training and skills development (all levels) • Job creation (all levels) • Contractor development (CIDB level 1-4) • Sustainability, increase industry skills base

  9. Length of road constructed per year • 82% of roads are older than design life of 20 years, 24% of roads have reached more than twice design life – Are we in a crisis ?

  10. More than 36% of road network is heavily congested • A further 17% should be considered for capacity upgrading, and are congested during peak hours • Congested roads contributing to maintenance problems (e.g. use of gravel road shoulders) and road safety problems • Heavily congested roads are generally the older roads which needs rehabilitation • *AADT= Annual average • daily traffic volume

  11. Up-scaling of EPWP in Roads • Additional R5.4bn to Provinces for up-scaling of EPWP from 2007/08 (PIG). • Gauteng decision to increase amounts even further from Provincial funding: • 2006/2007 amount from R52m to R170m • 2007/08 amount from R82m to R262m • 2008/09 amount from R103m to R320m • Total R 752m • Further funding bid 09/10 MTEF allocation [ R 1 Bil ?]

  12. THE CHALLENGE

  13. Challenges • Backlog on provincial road network – 82% of network older than design • App 3000km Gravel road – townships • Agreements on appropriate norms, standards, designs • Resistance to change- innovative contracting models, materials, construction methods required

  14. SOSHANGUVE ATTERIDGEVILLE MAMELODI MUNSIEVILLE SOWETO SEBOKENG RATANDA BOIPATONG BOPHELONG SHARPVILLE DAVEYTON DUDUZA THEMBISA KAGISO THOKOZA KATLEHONG MOHLAKENG WATTVILLE KWA-THEMA TSAKANE 20 Identified townships

  15. Challenges • Cost for township road less 500 car per day currently ranging R6m to R10m per kilometre ? • Inexperienced contractors – tender process and documentation not fully understood • Contractor access to finance, materials, equipment problematic • Professional site management? • Skills development basket roads industry

  16. RE-DRESS

  17. Innovation required • Reduce construction costs • New construction methods • Alternative construction materials • Innovative and appropriate pavement design • Research and testing • New contracting models • Appropriate norms and standards for all roads • Consistently applied across all metros/ municipalities

  18. Economic consideration Social consideration Effective, Efficient, Value For Money, Service Delivery Service Delivery Model Objective

  19. Thank You “In order to achieve real action you must yourself be a living part of Africa and of her thought; you must be an element of that popular energy which is entirely called forth for the freeing, the progress and the happiness of Africa.” Frank Talk , Steve Biko , I write what I like

More Related