Update on ‘Real estate’ for Level-0

Update on ‘Real estate’ for Level-0. Global considerations for placement of electronics and cables Muon detector and muon trigger options Calorimeters and calorimeter trigger options Summary. Global considerations for placement of electronics and cables.

lynley
Télécharger la présentation

Update on ‘Real estate’ for Level-0

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Update on ‘Real estate’ for Level-0 Global considerations for placement of electronics and cables Muon detector and muon trigger options Calorimeters and calorimeter trigger options Summary F Harris LHCb Trigger Meeting

  2. Global considerations for placement of electronics and cables • We are assuming no radiation worries onperimeters of muon and calorimeter detectors (get up to date information in electronics/background meetings Wed morning) • Must allow detectors to be opened without uncabling • Cabling ‘no go’ areas • On floor - because of rails • Some overhead areas- racks on top of detectors. Also muon frame suspension? • Accessibility • Detector side of wall - one very short access/day(?) • Far side of wall preferable, if compatible with costs, packaging,latency considerations, and the physics of detectors and links (more on links Electronics meeting Wed morning) F Harris LHCb Trigger Meeting

  3. Distances (Detailed routes not shown) Electronics racks (calo) LHCb Behind the wall 30 m 30 m Electronics crates 35 m Lo decision Electronics racks (muon) Electronics racks (muon) TS and TTC 70 m Electronics racks F Harris LHCb Trigger Meeting

  4. Crate and cabling for calorimeters(ECAL,HCAL,PS) • Number of 9U CRATES • Sub-Detector Whole Detector Half-Detector • PreShower 8 4 • ECAL 14 7 • HCAL 4 2 • TOTAL 26 13 • POSITIONING and INDEPENDENCE • On top of calorimeters • HCAL independent of ECAL+PRESHOWER • CABLING • In the vertical plane - bottom to the top F Harris LHCb Trigger Meeting

  5. Comments on proposed Calorimeter electronics layout • ADVANTAGES DISADVANTAGES • Short ‘inner’ cable lengths(<10 m.) ? Access above calorimeters • Routing above detector Need mobile/removable trays • No cables on the ground (manoeuvring) F Harris LHCb Trigger Meeting

  6. Calorimeter Trigger - update on Orsay proposal (information O Callot/I Videau) • Boards and crates (9U)for trigger electronics • Trigger logic for each channel embedded in FE-card. (14 crates of FE-logic for ECAL and 8 for PreShower. 4 crates for HCAL). • Summary Cards for ECAL, PreShower, HCAL embedded in FE-crates • ECAL Selection Crate • HCAL Selection Crate • Location of trigger electronics • Channel logic and Summary Cards embedded in FE-logic on-detector (top) • Selection Crates on balcony (cable distance up to ~30m.) • Links for trigger electronics • PreShower to ECAL (500) ? in the same crate or nearby crate • (backplane or v. short links) • Pad to Preshower 250 1 Gbit links 10 m.? • ECAL to HCAL 100 1 Gbit links 10m. ? • Links to Selection crates 125 1 Gbit links up to 30m. F Harris LHCb Trigger Meeting

  7. Calorimeter Trigger - update on Bologna proposal (information M Bruschi) • Boards and crates for trigger electronics • L0 Board handles • 8*4 Ecal channels • 4*2 Hcal channels • 32 PS channels • 64 PAD channels • Number of boards and crates • 192 Boards 14 (7+7) crates(9U) • Location of Trigger electronics (To be discussed this week) • Prefer close to ECAL FE electronics (which is on top of detector) - NOT on balcony • Links • 26/board ~5K links • 3456 ‘short’ ECAL-ECAL • 1152 ‘medium’ PAD-ECAL, PS-ECAL • 384 ‘long’ HCAL-ECAL F Harris LHCb Trigger Meeting

  8. Proposal for Muon Detectors on-detector electronics (OR logic) • ~26 1/2 width 9U crates (2*(4+3+2+2+2)) MU1 to MU5 • Positioning • Crates on frame each half-muon plane • Displacements perpendicular beam axis must be independent • Cabling • over the top of detector • ADVANTAGES DISADVANTAGES • Shorter ‘inner’ cables ?Additional mobile platform both sides • No cable on ground ? Mobile/removable cable trays on top F Harris LHCb Trigger Meeting

  9. Marseille Muon Level-0 Proposal - updates • FEBIs close to FIP and DMP (cable lengths 4-5 m.) • FEBIs contain ‘off-detector electronics’ I.e. Level-0 and Level-1 pipelines, derandomiser buffer as well as interface to trigger processing • 14 9U crates for FEBIs(each FEBI board handling 256 PADs) • ~1400 1 Gbit links from OR logic to to FEBIs (each handling 32 channels) • Length 34-80 m. - ? COST • Connecting FEBIs to Trigger procesors • Links 4-5 m. • For FIP/DMP connections need ~100 (? Cu, optical) • If connect to 3D will need ~1400 ‘short’ 1 Gbit links • Positioning of FEBIs+Trigger Processors • Strong preference for behind the wall F Harris LHCb Trigger Meeting

  10. First estimates for Cable Lengths from detectors to FE electronics on the balconies( D Lacarrere) • Sub-detector Distance to FE crate (m.) • Min Max • Vertex 12 20 • Rich1 10 20 • Rich2 20(35) 25(40) • Ecal 20(35) 25(40) • Hcal 15(30) 20(35) • Muon 15(30) 20(35) • These estimates reflect the 1st iteration (+- 1 m.) F Harris LHCb Trigger Meeting

  11. Summary of some System characteristics of Level-0 trigger proposals • Calorimeter triggers • Option Crates Location Link • 3D 3 ? ? • Bologna 14 On det ~5000(including det links) • Orsay 2 Balcony ~1000 (475*10m+) • Muon trigger • Option Crates Location Links • 3D 1 ? ? • Marseille 2/3 Balcony/Far ~100*5m. • Gatchina ? ? ? F Harris LHCb Trigger Meeting

  12. Placement of Muon and Calorimeter Electronics • Muons • Location Function Crates Input Cables • Chamber sideOR logic 26*1/2 9U ~200 K (up to 11m.) • Balcony/Far FEBIs 14*9U ? ~2K (up to 40 m.) • Calorimeters(ECAL+HCAL+PRESHOWER) • Location Function Crates Input Cables • Top ECAL+HCAL A/D 26*9U F Harris LHCb Trigger Meeting

  13. Placement of MUON electronics F Harris LHCb Trigger Meeting

  14. Summary Comments • Proposals evolving - would expect changes following discussions this week at muon, calorimeter and electronics + background meetings. • Must confirm backgrounds acceptable for electronics • Map link technology with costs to proposals • include detailed link ‘handling’ in evaluations • Details of placement of electronics on and adjacent to detectors to be worked out F Harris LHCb Trigger Meeting