1 / 13

G2P Installation Readiness

G2P Installation Readiness. Fast raster & Calorimeter. Upside down girder. FZ magnets. Target platform. Target Platform security. Prex Radcon security fence Gates Interlocked magnetic locks Warning beacons E stop button Bolted on window covers. Septum Magnet.

lynnea
Télécharger la présentation

G2P Installation Readiness

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. G2P Installation Readiness

  2. Fast raster & Calorimeter

  3. Upside down girder

  4. FZ magnets

  5. Target platform

  6. Target Platform security Prex Radcon security fence Gates Interlocked magnetic locks Warning beacons E stop button Bolted on window covers

  7. Septum Magnet • In place • Pre aligned • Power shielding installed • Water lines tested • Working on OSPs for power up

  8. Power supplies • Have begun operational checkout of • Big Box • HKS • FZ 1 • FZ 2

  9. Beam Dump • Lead parts here • Inserts are here • Tungsten here with issues to resolve

  10. Third arm • Being assembled

  11. Experiment OSPs • Slow Raster operation and testing Being written • FZ magnets operation and testing Complete • FZ 2 magnet positioning and alignment Being written • Target operation and testing In review • HKS power supply operation and testing In review • Big Box power supply operation and testing In review • Septum magnet operation and testing In review • Septum magnet mapping Being written • Lower balcony access for third arm access In review • Beam dump insert removal and replacement In review

  12. Concerns • Survivability of target magnet • Radiation levels at local beam dump

  13. Questions?