1 / 16

Project Xxx

Project Xxx. HDR. Project Xx Core Team. Decisions requested Product definition Marketing Requirements Technical Alternatives Selected Approach Product Specifications System Architecture Initial DFX Service Manufacturing Test Materials Cost. Development Approach R&D Schedule

mabbott
Télécharger la présentation

Project Xxx

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Xxx HDR Project Xx Core Team Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  2. Decisions requested Product definition Marketing Requirements Technical Alternatives Selected Approach Product Specifications System Architecture Initial DFX Service Manufacturing Test Materials Cost Development Approach R&D Schedule R&D Resource Requirements Technical risks and risk management Decisions requested Agenda Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  3. Decisions requested • Approve readiness for the planning & specification stage Review (from technical stand point) • Approve project technical approach • Validate product technical specs and system architecture • Approve R&D schedule and resources Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  4. Marketing Requirements • Outline here the key features/functionality which are expected by Marketing Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  5. Technical alternatives • Present here the various technical alternatives which have been considered • Technologies • Performance • Risks • Resources Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  6. Selected Approach • Present here the decision criteria and the rationale which conducted the Team to select one technical approach rather than the others Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  7. Technical Specifications • Outline here the high-level technical specifications corresponding to the selected approach • Mention whether the detailed specs have been reviewed and validated in DRs held before HDR Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  8. System Architecture • Present here the initial system architecture • Major block diagrams • Split between H/W and S/W • Major interfaces • Dataflows • (Note: several slides might be needed) Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  9. Initial DFX • Demonstrate that R&D is taking into account the requirements from other functions early in the process • Service • What are the serviceability objectives for the product and what are the implications in terms of design? • Manufacturing • Given the current specs and architecture, has manufacturing identified any gap in production technology? Are there any specific manufacturing requirements which should be considered during detailed definition? Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  10. Initial DFX (cont’d) • R&D Test • What are the strategy and the high-level plans for R&D tests (including unit, integration, engineering, alpha and beta tests) • Manufacturing Test • What are the strategy and the high-level plans for Manufacturing tests? What are the requirements which need to be included in the design? • Materials • Has the initial BOM been reviewed by the Commodity Group? Component Engineers? Are there vendor qualification issues? • Finance • Does the current design support the cost objectives for the product? Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  11. Development Approach • Show R&D schedule with major milestones • Show R&D resource requirements Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  12. Project Schedule and Resources Design and Verification stage Test & Eval. stage Release stage Example PDR CDR IR FDR Detailed Definition Detailed Design H/W dev. Alpha Proto S/W dev. Alph. Eng. Test Integration Beta Proto Rev A Proto Rev B Pilot Build B 1st Pilot Build Pilot Build A FCS v Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  13. Risks and contingencies Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  14. Decisions requested • Approve readiness for the planning & specification stage Review (from technical standpoint) • Approve project technical approach • Validate product technical specs and system architecture • Approve R&D schedule and resources Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

  15. Back-up slides Atrica Confidential – NDA Required – Do Not Duplicate or Redistribute

More Related