1 / 7

Motivation for the Case Study

Case Study #2: Landscape Ice Road Suitability Assessment NSDSS Workshop 4 September 19-20, 2012 Fairbanks & Anchorage, Alaska. Motivation for the Case Study. NSDSS Workshop #3 Held in Fairbanks, April 2011

Télécharger la présentation

Motivation for the Case Study

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Case Study #2: Landscape Ice Road Suitability AssessmentNSDSS Workshop 4September 19-20, 2012Fairbanks & Anchorage, Alaska

  2. Motivation for the Case Study • NSDSS Workshop #3 • Held in Fairbanks, April 2011 • Attendees asked for promising case studies to demonstrate effectiveness and needs for improvement • Among the suggestions: Possibility of ice road construction off of potential permanent roads • Potential road to Umiat is good example • Key questions: • Is there water available for ice road construction? • Would cost be feasible? • Can we compare route alternatives versus each other?

  3. Basic Assessment Concept • Since we don’t know all the details, keep it simple • Plan regular spurs off of main road at regular intervals • Do basic Ice Road Planning procedure for each spur • (Sullivan 2007)

  4. Case Illustration • Hypothetical road: Dalton Hwy – Kavik Camp – Coast • ~47 mi; “Lake-rich” at ends, “Lake-poor” in middle

  5. Case Illustration • Suitability analysis: • Ice road start points at 50,000 ft spacing • Each ice road 25,000 ft long • Lakes identified along corridor

  6. Case Illustration • Tool batch processes 10 ice road routes and displays properties of lowest cost routes for each road.

  7. Case Illustration • Water haul distance changes dramatically along gravel road ~5 mi 6.3-8.4 mi 2.6-6.4 mi 2.2-3.9 mi 34-36 mi

More Related