1 / 7

Integrated River-Basin Management Model for a Target River Basin (Selenga River)

First Draft. Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE. Background. √ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development - Organize Four Thematic Groups

marcin
Télécharger la présentation

Integrated River-Basin Management Model for a Target River Basin (Selenga River)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. First Draft Integrated River-Basin Management Model for a Target River Basin (Selenga River) KOREA ENVIRONMENT INSTITUTE

  2. Background √ Jeju NISD Meeting (2005, Korea) - Build Institute Network for Sustainable Development - Organize Four Thematic Groups (Water, Transportation, National Park, Trade) √ Delft NISD Meeting(2005, Netherlands) - Reconfirm the dedications of NISD Network - Discussion on the Organizing Thematic Groups • Proposal: Development of Integrated River-Basin Management Model for a Target River Basin • Support UNEP/DTIE/ETB’s Efforts for Design & Implementation of Integrated Sustainable Development Policies

  3. STUDY SITE (Tentative) √ trans-boundary Issues √ Water Quality & Water Development Issues √ Capacity Building Requirement √ Cooperative Networks

  4. START Networking & Preparation Ad Hoc Working Group Meeting (3M) MOU between Participating Institutes(2M) Selection of Demo Site (6~7M) Compile IWM Experiences Year I Local Assessment Refine Derailed Work Plan (2M) Year II Basic Survey of Water Issues & Socio-Economic Condition(6M) Test Applicability of IWM Approaches (4M) Development IWM Model Year III Formulate IWM Model (8M) Capacity Building –Integrated Thematic Group Meeting (4M) Evaluate Applicability of Korean Schemes to PH WORK FLOW

  5. Task 1: Research Network -Share information -Share Experience -Capacity Building Activities Task 4 : Model Formulation -Test Applicability -Suggest IWM Framework -Capacity Building -IWM Model Framework -Policy Recommendation Report -Capacity Building -Technical Tools -Regulatory Tools -Market-Based Tools of IWM -Cooperative Network -Capacity Building Ad Hoc Meeting -IWM Guiding Principles -Review Report of IWM Task 3: Gap Analysis -Water Resource Development -Water Quality Management -Water Supply Task 2: Assessment of IWM -Regulatory -Market-based -Define Successful Components Main Objectives Expected Results &Output TASKS & EXPECTED OUTPUTS

  6. Other Thematic Groups (Capacity Building) Korea Environment Institute (water quality issues) Institute for Sustainable Futures (water development issues) UNEP (Supports & Coordination) All-Russian Research Institute For Nature Protection (watershed issues) Institute of Geoecology Mongolian Academy of Science (watershed issues) Other Institutes in Developing Countries (Capacity Building) COOPERATIVE FRAMEWORK (Tentative)

  7. Thank you ! Discussion

More Related