DRAW PROCEDURES FOR THE ARMY WAR RESERVE PROGRAM

DRAW PROCEDURES FOR THE ARMY WAR RESERVE PROGRAM. CPT DARRYL A. KELLY UNCLASSIFIED. PURPOSE. TO PROVIDE AN OVERVIEW OF THE DRAW PROCEDURES FOR USAREUR’S PREPOSITIONING OF MATERIEL CONFIGURED TO UNIT SETS. (POMCUS). REFERENCES. Fact Sheet - Army War Reserve Program

Télécharger la présentation

DRAW PROCEDURES FOR THE ARMY WAR RESERVE PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DRAW PROCEDURES FOR THE ARMY WAR RESERVE PROGRAM CPT DARRYL A. KELLY UNCLASSIFIED

  2. PURPOSE TO PROVIDE AN OVERVIEW OF THE DRAW PROCEDURES FOR USAREUR’S PREPOSITIONING OF MATERIEL CONFIGURED TO UNIT SETS. (POMCUS)

  3. REFERENCES • Fact Sheet - Army War Reserve Program • Fact Sheet - Equipment Draw/Turn in Procedures • USACEGE PAM 350-2 (REFORGER)

  4. OUTLINE • CEG-E AND UNIT RESPONSIBILITIES • LIAISON PARTY RESPONSIBILITIES • ADVANCE PARTY RESPONSIBILITIES • DRAW SEQUENCE • SUMMARY • QUESTIONS • CONCLUSIONS

  5. CEG-E RESPONSIBILITIES • CONFIGURE MAJOR ITEMS/EQUIPMENT • PROVIDE UNIT BASIC LOAD • MANUALS/AUTOMATED RECORDS • FUEL DIESEL POWERED VEHICLES • ACTIVATE BATTERIES

  6. UNIT RESPONSIBILITIES • DEPLOY WITH UNIT EQUIPMENT • MAN LIASON PARTY • MAN ADVANCE PARTY • TRAIN PERSONNEL TO DRAW POMCUS EQUIPMENT • SEMIANNUALLY REVIEW OF PREPOSITIONED ASL STOCKAGE

  7. LIAISON PARTY(1 OF 2) • COMPOSITION • MINIMUM OF 5 PAX (BN SET) • MINIMUM OF 3 PAX (CO SET) • LOG DECISION MAKER (XO)

  8. LIAISON PARTY(2 OF 2) • RESPONSIBILITIES • ARRIVE 24 HRS PRIOR TO ADVANCE PARTY • ESTABLISH LOGISTICAL BASE FOR DEPLOYING UNIT • REVIEW SITE CONFIGURATION • BEGIN INVENTORIES

  9. ADVANCE PARTY(1 OF 2) • COMPOSITION • LICENSED DRIVER FOR EACH VEHICLE • GROUND GUIDE FOR EACH TRACK VEHICLE • 1 NCO PER 10 DRIVERS (CONTROL) • MECHANICS w/NCOIC • ACCOUNTABILITY TEAM (CDR/OFFICER/SUPPLY PERSONNEL)

  10. ADVANCE PARTY(2 OF 2) • RESPONSIBILITIES • THE DRAW OF POMCUS EQUIPMENT AND MOVEMENT OF THE SET TO THE MARSHALLING AREA IS THE ADVANCE PARTY MISSION.

  11. DRAW SEQUENCE • PRE-DRAW • DRAW OF EQUIPMENT

  12. PRE-DRAW • POMCUS SITE BRIEF • KEY PERSONNEL BRIEF • MOVE TO DRAW STATION/INVENTORY

  13. DRAW EQUIPMENT • INSTALL BATTERIES • PERFORM SAFETY CHECKS • REMOVE VEHICLES FROM WAREHOUSE • DRAW FLOW STATIONS

  14. SUMMARY • CEG-E AND UNIT RESPONSIBILITIES • LIAISON PARTY RESPONSIBILITIES • ADVANCE PARTY RESPONSIBILITIES • DRAW SEQUENCE

  15. QUESTIONS

  16. CONCLUSION THE DRAW OF POMCUS EQUIPMENT IS A SERIES OF EVENTS WHICH A DEPLOYING UNIT MUST EXECUTE TO PREPARE FOR COMBAT IN EUROPE