1 / 29

Aerogel Upgrade Status ShinIchi Esumi

Aerogel Upgrade Status ShinIchi Esumi for the high pt upgrade team Introduction Design parameters Readout electronics Beam test with prototypes Simulation Plan. π/ K. K / p. TOF. σ ~ 100ps. 0~2.5. 0~5. RICH. n = 1.00044. 5~17. 17~. ACC.

Télécharger la présentation

Aerogel Upgrade Status ShinIchi Esumi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aerogel Upgrade Status ShinIchi Esumi for the high pt upgrade team Introduction Design parameters Readout electronics Beam test with prototypes Simulation Plan collaboration meeting in Nashville, Jun 10-13 2003

  2. collaboration meeting in Nashville, Jun 10-13 2003

  3. collaboration meeting in Nashville, Jun 10-13 2003

  4. π/ K K / p TOF σ~ 100ps 0~2.5 0~5 RICH n = 1.00044 5~17 17~ ACC n ~ 1.01 1~5 5~9 n=1.0112 collaboration meeting in Nashville, Jun 10-13 2003

  5. particle track azimuthal angle vertex z (beam) direction collaboration meeting in Nashville, Jun 10-13 2003

  6. Prototype in run3-pp air Aerogel n=1.0112 +- 0.0002 11cm 22cm collaboration meeting in Nashville, Jun 10-13 2003 11cm

  7. collaboration meeting in Nashville, Jun 10-13 2003

  8. collaboration meeting in Nashville, Jun 10-13 2003

  9. collaboration meeting in Nashville, Jun 10-13 2003

  10. Motoi Inaba Design of Bleeder (Ver. 2) collaboration meeting in Nashville, Jun 10-13 2003

  11. Schedule Five types of Bleeder Ver.3 will be delivered in June. Type Divider Resistor Idling current Power consumption Comments A 330 k ohm 0.453 mA 680 mW Hamamatsu Standard B 470 k ohm 0.318 mA 478 mW C 560 k ohm 0.267 mA 401 mW D 680 k ohm 0.220 mA 330 mW Intend to use E 750 k ohm 0.200 mA 300 mW (at 1500 V) (at 1500 V) We test them and select one for mass-production. New bleeders will be soldered with PMTs at Tsukuba Univ. by Motoi INABA. collaboration meeting in Nashville, Jun 10-13 2003

  12. Calibration system using LED 1 2 PHENIX TTL (LED) DRIVER 3 4 5 1 PPG 6 TTL 7 2 8 9 3 10 200 ohm LED Special category-5 cable. 8 collaboration meeting in Nashville, Jun 10-13 2003

  13. Signals on the bench test Input signal (100 [Hz]) Output signal of Driver Gate of ADC PMT ( ~ 11 p. e.) DRIVER TTL 50 ohm PMT LED Gate of ADC collaboration meeting in Nashville, Jun 10-13 2003

  14. 1.5m #Preamp:20 1.2m 3.5m Trig FEE HV LV 2.0m <4m? From GTM • Aerogel One sector: • 80 segments • 160 channels To DCM 1 DCM channel/ one sector Kyoichiro Ozawa Narumi Kurihara Takashi Matsumoto Current design of Aerogel Counter Aerogel Counter 160 segments of Aerogel Counter are located in Sector 1 at west arm. 160ch of PMT signals are led to North side, and another 160ch are led to South side. PreAmp 20 PreAmp boards are placed both side of Aerogel Counter. FEE & HV rack Racks for FEE and HV modules are located the second floor at west arm. collaboration meeting in Nashville, Jun 10-13 2003

  15. North side of Read out electronics Multi coaxial cable. 3 ~ 4 m Signal cable RG174 1.5~3.5 m 5 AMU/ADC Modules have 320ch of inputs. G Link to DCM Read out module 5 transition cards. Integrate 8 multi coaxial cables in one board. Aerogel Box. 80 segments. 160 channels. Preamp 8 preamp circuits are on one board. 20 boards are in one side. collaboration meeting in Nashville, Jun 10-13 2003

  16. 25ns Cross talk in Preamp 3ch input Example: 50mV input pulse to 3ch 50mV 3ch output 140mV 5mV 4ch output Input to 3ch 3mV 1ch output • Signal line which is next to 3ch is most affected. • Each signal of cross talk is bipolar signal. • Maximum pulse height of cross talk is 5mV. • When the input was 200mV of pulse height, the • maximum pulse height is 10mV. • For ADC measurement, the cross talk signal carry no charge. 1mV 6ch output collaboration meeting in Nashville, Jun 10-13 2003

  17. Beam test at KEK-ps Particle selection by TOF (2GeV/c, positive) collaboration meeting in Nashville, Jun 10-13 2003

  18. Y 12cm PMT2 PMT1 15cm Aerogel PMT PMT 12cm (0,0) X BEAM Beam 15cm Y PMT2 12cm X 21cm 12cm (0,0) PMT Air PMT PMT1 Y Beam Aerogel 12cm 11.5cm PMT2 PMT1 12cm (0,0) X BEAM Beam 22cm collaboration meeting in Nashville, Jun 10-13 2003

  19. λabs λsct beam data simulation Optical simulation Satoshi Takagi Masahiro Konno BEAM collaboration meeting in Nashville, Jun 10-13 2003

  20. cosmic ray test in our lab. Satoshi Takagi collaboration meeting in Nashville, Jun 10-13 2003

  21. Magnetic shield test at Lab Maya Shimomura collaboration meeting in Nashville, Jun 10-13 2003

  22. Run3-pp prototype test TDC ADC ADC Online monitoring Shingo Sakai TDC collaboration meeting in Nashville, Jun 10-13 2003

  23. Offline analysis Hiroshi Masui ~8 p.e. ~8 p.e. single pmt hit single pmt hit coincidence hits to be evaluated with external tracking low gain ADC high gain ADC collaboration meeting in Nashville, Jun 10-13 2003

  24. z PISA simulation Satoshi Takagi #of fired cell/ central event ~ 8% occupancy back ground sources seen in aerogel detector x collaboration meeting in Nashville, Jun 10-13 2003

  25. TOF(p) && ACC ACC && RICH PID and trigger simulation Masahiro Konno Maya Shimomura kaon thresh. in ACC kaon efficiency pion thresh.in RICH kaon purity Hijing simulation + TOF/RICH/ACC response proton thresh. in ACC momentum collaboration meeting in Nashville, Jun 10-13 2003

  26. LVL2 trigger plan for run4-AuAu • select all PC3 hits in aerogel shadow; • select all PC1/PC3 tracks with reasonable • vertex cut (say BBC+-10cm); • (3) cut on momentum (we'll have ~5% resolution); • (4) check for a RICH ring; • (5) match hit to EMC cluster; • (6) match to the hists in aerogel, use both timing • and amplitude; • (7) use all this information to make a decision; collaboration meeting in Nashville, Jun 10-13 2003

  27. 5. Aerogel SP-12M, Matsushita Electric Works, Ltd. Refractive index ; n = 1.0112 +- 0.0002 Tile Size ; 112.5 +-1 mm x 112.5 +- 1 mm x 11.0 +- 0.5 mm Very fragile Already delivered to Univ. of Tsukuba $ 6. Others Epoxy glue (as sample) Double-sided tape, Stapler (Goretex) Sponge rubber (packing) Bleeder (Tsukuba) Type: INABA-original Ver. 3Size: 80 * 75 * 1.6 mm^3 (P. C. Board) 80 * 75 * 14 mm^3 (Including parts)Power consumption: 456 mW (at 1000 V) 685 mW (at 1500 V)Maximum working voltage: 2500 V (Maximum voltage of PMT is 1500 V ! )Dielectric withstanding voltage: > 3200 V (from long term test.) = 5000 V (from parts specification) (Maximum voltage of PMT is 1500 V ! )Delivery schedule: In June.High Voltage Cable (Tsukuba ? BNL ?) Type: Not yet (GX03173-01 ? The same as TOF ?)Production company: OTTO SUHNER AG.Delivery schedule: 3 weeks after ordered.Signal Cable PMT-to-PreAMP (CNS, Tokyo-Univ.)(BNL)(Tsukuba)Type: RG-58A/U or RG-122/U or RG-174/U. (50-ohm coaxial cable). Now testing at CNS.Production company: Cabling pattern: Not yet.Number of cables: 320. (160 for Run-4).Delivery schedule: PreAMP-to-FEE (CNS, Tokyo-Univ.)(BNL)Type: UL8233. (50-ohm multi-coaxial cable).Number of channels per cable: 8.Production company: Cabling pattern: Not yet.Number of cables: 40. (20 for Run-4).Delivery schedule: A test cable on May 20th. 1. Aluminum Box (Dubna) Two Pre-production boxes in BNL $ Construction of 160 boxes + alpha * 2. PMT 2-1 PMT 320 PMTs (R6233-01HA, Hamamatsu) delivered to Univ. of Tsukuba $ Light shield paint for the back of PMT * Bleeder soldering * Calibration (Gain, Noise, Timing response) * 2-2 Bleeder (INABA-original) Some tests needed * Delivery in June * 2-3 Connectors (AMP, Tyco Elec. Corp.) HV x 2, Signal x 2, LED x 1 Delivery ? 2-4 Short cables (~15cm, Bleeder - Connector) HV x 2, Signal x 2 Preparation * 2-5 G-10 board Construction by CI Industry Co.Ltd * 2-6 Black cloth for light shielding (Lid - G10 board) Preparation * 2-7 PMT+Shield holder (A, B) Material ; Unilate (PET). Construction by CI Industry Co.Ltd (Now estimated) * 3. Magnetic shield case Tested by Maya $ ->Cylindrical shape (Length ; 80 mm / Outer diameter ; 80 mm / Thickness ;0.5 mm), Material ; Permalloy. Construction (Now estimated) * 4. Internal Box 4-1 Mylar sheet Cosmic ray test done (0.35 pe per sheet) $ -> Transparent polyester film (100um thick.) Delivery and cutting (Now estimated) * 4-2 Goretex sheet DRP Reflectors (reflectivity > 99%, 500um thick), Japan Goretex Inc. Delivery and cutting (Now estimated, 2 weeks after order.) * collaboration meeting in Nashville, Jun 10-13 2003

  28. LED driver (BNL)(Tsukuba) Type: A TTL driver for PHENIX.Production: PHENIX, BNL.Number of output channels: 10.Drivability: 80 LEDs. (10 LEDs / channel).Crate: Standard NIM module.LED: E1L33-3B. (Toyoda Gosei Co., Ltd.) Peak wavelength is 468 nm (Blue).Low voltage: +6 V, -6 V, +24 V, -24V.Cooling: Required.Delivery schedule: Testing at Tsukuba in April and in May.High voltage module (BNL) Type: Production company: Number of output channels: 320 or 160. (160 or 80 for Run-4.)Number of output channels per module: Crate: Delivery schedule: Unknown.Low voltage module (BNL) Type: Production company: Output voltage: Not fixed yet. (+6 V, -6 V, +9 V, -9V, +12 V, -12 V, +24 V, -24 V. ?)Number of output channels per module: Crate: Delivery schedule: Unknown. PreAMP (Pre-amplifier) (CNS, Tokyo-Univ.) OPAMP chip: AD8009 (Analog Devices, Inc.) (1 GHz, 5,500 V/μs low distortion amplifier.)Type: Voltage sensitive non-reverse amplifier.Design: Circuit diagram. Photograph. Gain: 2.25Number of channels per board: 8.Number of boards: 40 (20 for Run-4).Power regulator chip: TA7805 (positive), TA79005 (negative).Operating voltage: +8.5 V & -8.5 V (more than 300 mA) (Minimum voltages for stable operation.)Size: 90 * 70 mm^2 Output impedance: 50 ohm Cooling: Required. ESD protection: Yes. Crate: Design by CNS (10 boards / crate). Delivery schedule: Protp-type has delivered. Now testing at CNS. Mass production will be completed in July. FEE (Front-End Electronics) (CNS, Tokyo-Univ.) Design: The same as RICH FEE.Production company: Kindai Denshi Co.Ltd. (Japan).Dynamic range of charge: 0 - 160 p. e.Components: 10 AMU/ADC boards 2 readout board. 1(or 2) conrtol board. 10 transition card.Crate: One is ready in CNS. Another one is ordered.Transition card: Prototype on May 26th.Power supply: Delivery schedule: In July, and then, testing.Trigger module (CNS, Tokyo-Univ.) Type: Aerogel LVL-1 trigger.Design: Not fixed yet.Delivery schedule: Not installed in Run-4. (Use LVL-2 trigger for Run-4 Au-Au.) collaboration meeting in Nashville, Jun 10-13 2003

  29. Plan Finalize CDR Design and mechanical reviews Electric and safety reviews Final beam tests Construction (box cell, frame, LED, breeder, preamp, FEE) Assembly Installation Simulation and reconstruction software collaboration meeting in Nashville, Jun 10-13 2003

More Related