An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SABIC’s Mega Projects Outlook 2006-2010

  2. Table Of Contents:- Project listing - Production quantities - Project Details - Manpower Requirement - Related Opportunities

  3. SABIC Projects 2006-2010 $12.0 Billion

  4. SABIC Projects 2006-2010 $13.9 Billion

  5. Production Increases for 2006-2010 • Olefin Crackers - 4150 kta • Polyethylene (L/LDPE/HDPE) - 3000 kta • Polypropylene - 1250 kta • EO/Ethylene Glycols - 2570 kta • PVC/VC Monomers - 1000 kta • Methanols - 5000 tpd • Ammonia/Urea - 6550 tpd • O2/N2 Separation Plants - 9600 tpd • MMA - 150 kta • Iso Octane - 400 kta • PET - 720 kta • PTA - 180 kta • Butene 1 - 125 kta • BTX - 250 kta Plus Other Downstream Plants

  6. Projects Details

  7. Project Cost Breakdown Equipment & Bulk Materials 15.0 12.5 10.0 Field Construction Cost in $ Billions 7.5 Engineering & Management $13.5B 5.0 $7.7B 2.5 $4.7B 0

  8. Equipment Estimate by Weights Exchangers/Coolers 132,000 metric tons Pumps 20,000 metric tons Compressors 25,000 metric tons Tanks & Vessels 135,000 metric tons Columns/Reactors 193,000 metric tons Package Equipments 4,000 metric tons Total Estimated Weight of Equipments – 509,000 Metric Tons

  9. Estimate of Major Bulk Materials Piping 8,900,000 meters Various diameters and material type Building/Architectural 70,000 square meters Admin/control/lab/others Civil/concrete 2,100,000 cubic meters Different class type Structural Steel 570,000 metric tons Heavy, medium, light steel Electrical Cables 16,000,000 meters Various diameters and material type Paint/Insulation 3,700,000 square meters Various coating materials Instrument Cables 12,600,000 meters Various diameters and material type

  10. Construction Cost HVAC $70 Million Mechanical $930 Million Structural $610 Million Piping $2,550 Million Total Cost $7,700 Million Civil $1,620 Million Electrical $930 Million Paint /Insulation $380 Million Instrument $610 Million

  11. Manpower Requirement

  12. Engineering & Management Services Average Peak Engg. 5,600 men - 2007 6000 5000 4000 Engineering Services Average Man-Year 3000 2000 Average Peak Mgmt 1,500 men - 2007 1000 Project Management Services 0 2005 2006 2007 2008 2009 2010 Calendar Year

  13. Construction 60000 51,000 Ave. Man (July-Sep 07) 50000 40000 Average Man - Quarter 30000 Construction -Under Devt 20000 Construction -On going 10000 0 2006 2007 2008 2009 2010 April 2006 - Dec 2010 2007 2008 2009 2010

  14. Construction by Discipline

  15. Projects Related Opportunities

  16. Engineering Piping Chemical Process Civil Electrical Mechanical HVAC/Fire fighting Safety and Security Project Management Construction Engineering and Management Service Centers Materials Local Manufacturing (e.g. Gaskets, pre-cast concrete, steel structures, switch panels ... Etc Manpower Supervision Skill Enhancement Higher Education Craftsmen/Tradesmen Schools Related Opportunities

  17. Infrastructure Health care Housing Commercial Centers Communication/Satellite Service Providers Portable Offices Service/Repair Workshops and Centers Family Centers Hotels Logistics Heavy/Light Lift Equipments Customs Clearance & Expediting Services Chemical Cleaning & Treatments Tools Rental Inspection Services Quality Controls Testing Related Opportunities ( Continues……)

  18. Thank You