An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NUSTAR-5 Design and construction of a superfluid-helium stopping cell Involved institutes: * JYFL, Jyväskylä * GSI * KVI (not as contractor) NUSTAR-5, C. Scheidenberger

  2. Objective Design of a cell, operated with superfluid helium, for the stopping of energetic radioactive ion beams. Tests and performance study with a prototype using radioactive beams available in Jyväskylä alpha detector Detector holder foil Collector foil 5 cm 2 3 4 0 1 electrodes Guiding electrodes Focusing electrode Bottom electrode Source NUSTAR-5, C. Scheidenberger

  3. Present status (1) alpha detector Al foil -200 V 223Ra 540 V NiCr heater electrode 520 V 219Rn extracted from the surface 7.2(6) % extraction efficiency 219Rn trapped at the surface needs confirmation NUSTAR-5, C. Scheidenberger

  4. Present status (2) • - Proposed stopping cell dimensions may also be • reached using a cryogenic gas catcher (T≤20 K) • * 20 K technically less demanding than <2 K • * ions do not need to cross the boundary between • the liquid- and gas-phases • 2×3 days of beam time used in 2005 • * technical problems in the liquid helium cell tests • * cryogenic helium gas catcher (77 K) tests gave • promising results • freezing out of impurities works technically easier than ultra-pure at room temperature • fundamental upper limit the measured efficiencies are determined by the cross sections NUSTAR-5, C. Scheidenberger

  5. Present status (3) Recent measurements at JYFL overlayed on a compilation of other results Extraction efficiency of helium gas ion catchers as a function of ionisation rate, as presented by D.J.Morrissey at the SMI-06 Workshop, Groningen, the Netherlands, March 27-28, 2006 NUSTAR-5, C. Scheidenberger

  6. Deviation from original workplan 1) Delay: Tests done earlier this year at Jyvaskyla with the cryostat from KVI failed partly due to a technical problem (leak) instead: measurements with the cryogenic gas catcher 2) New concept: Already stressed in January meeting, progress since then, tests in 2007, looks very promising NUSTAR-5, C. Scheidenberger

  7. Outlook on completion KVI: the study of the superfluid liquid-helium catcher will be pursued at KVI (off-line developments aiming at fast and efficient extraction via second sound waves), feasibility has to be demonstrated JYFL: * study of cryogenic gas catcher will be pursued at JYFL, development of a system for on-line tests underway (drawings being prepared, construction starts early 2007) * confirm the off-line results and test the transport of ions from cryogenic cell to vacuum * proposal accepted, beam time in preparation GSI: * beam time request under preparation  program will be finished within ~ 1 year NUSTAR-5, C. Scheidenberger