1 / 17

REACH: data sharing and SIEF (RIP 3.4)

REACH: data sharing and SIEF (RIP 3.4). Dr. Erwin Annys Sr. Advisor Product & Innovation Policy WERCS 2007 EU User group Napoli 31/05/07. Pre-registration. REACH makes a distiction between New substances (brought on the European market after 1981)

oria
Télécharger la présentation

REACH: data sharing and SIEF (RIP 3.4)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. REACH: data sharing and SIEF (RIP 3.4) Dr. Erwin Annys Sr. Advisor Product & Innovation Policy WERCS 2007 EU User group Napoli 31/05/07

  2. Pre-registration • REACH makes a distiction between • New substances (brought on the European market after 1981) • Substances on the European market before 1981 • Phase-in substances WERCS EU User group 2007 – Erwin Annys

  3. Registration Pre-registration >100 ton > 1 ton >1000 ton CMR >1 ton N, R50-53 > 100 ton 0 1 2 3 4 5 6 7 8 9 10 11 Non phase-in substances 01/06/08 01/12/08 01/06/18 01/12/10 01/06/07 01/06/13 WERCS EU User group 2007 – Erwin Annys

  4. Pre-registration • Pre-registration is CRUCIAL if you wants to use the mentioned delays for registration • What to pre-register? Everything you have to register! WERCS EU User group 2007 – Erwin Annys

  5. What to register? WERCS EU User group 2007 – Erwin Annys

  6. Pre-registration • Only for phase-in substances • EINECS • Manufactured but not brought on the market the last 15 years before the entry into force • No-longer polymers WERCS EU User group 2007 – Erwin Annys

  7. Pre-registration • Between 12 and 18 months after the entry into force of REACH • Name of the substance and EINECS and CAS number • Name and address contact person • Envisaged deadline for the registration and the tonnage band • Name of substance(s) and EINECS and CAS number(s) for which the available information is relevant for (Q)SAR or grouping or read-across WERCS EU User group 2007 – Erwin Annys

  8. Pre-registration • Agency: 1 month after the deadline, publication on the website of • Name of the substances • CAS and EINECS number • Agency: non publicly available list of those that pre-registered the same substance WERCS EU User group 2007 – Erwin Annys

  9. SIEF and consortia • Pre-registration brings you into • Substance Information Exchange Forum (SIEF) • SIEF has two objectives • Facilitate the exchange of information hence avoiding duplication of the studies • Agree on classification and labelling WERCS EU User group 2007 – Erwin Annys

  10. SIEF and consortia • Testing on vertebrate animals • Shall share information • Other testing • May share information WERCS EU User group 2007 – Erwin Annys

  11. SIEF and consortia • From 12 untill 18 months pre-registration • After 19 months list(s) agency • SIEF member • Ask for tests on vertebrate animals available within SIEF • Within one month • Proof of cost • Determined in a fair, transparant and non-discriminatory way WERCS EU User group 2007 – Erwin Annys

  12. SIEF and consortia • SIEF • Sharing of data • Consortia • Not mentioned in REACH text • But the sharing of data will make this necessary • Experience with High Production Volume (HPV) programm, but this was voluntary WERCS EU User group 2007 – Erwin Annys

  13. Pre- Registration Pre- SIEF SIEF IdentifysimilarSubstances Pre- Registr.data ‘Contacts’ List Agency Industry Pre- Registrationdossiers SIEF AllocatePre-SIEF Facilitator SIEF Formation Data Exchange Study Substance Id. Analysis WERCS EU User group 2007 – Erwin Annys

  14. Pre- Registration Pre- SIEF SIEF • Identifier = EINECS # (encourage to use 3.10 guidance) IdentifysimilarSubstances Pre- Registr.data ‘Contacts’ List Agency Industry Pre- Registrationdossiers SIEF AllocatePre-SIEF Facilitator SIEF Formation Data Exchange Study Substance Id. Analysis WERCS EU User group 2007 – Erwin Annys

  15. Pre- Registration Pre- SIEF SIEF • Pre-SIEF • Updates will be done continuously • Companies will be notified: • by email • by query • Identifier = EINECS # (encourage to use 3.10 guidance) IdentifysimilarSubstances Pre- Registr.data ‘Contacts’ List Agency Industry Pre- Registrationdossiers SIEF AllocatePre-SIEF Facilitator SIEF Formation Data Exchange Study Substance Id. Analysis WERCS EU User group 2007 – Erwin Annys

  16. Pre-SIEF • Updates will be done continuously • Companies will be notified: • by email • by query Pre- Registration Pre- SIEF SIEF • Identifier = EINECS # (encourage to use 3.10 guidance) • Pre-SIEF: • Pre-SIEF facilitator is first notifier (by default) • Facilitator role can be passed on to someone else • Facilitator expectations: • Manage Pre-SIEF agreement • Distribute 3.10 guidance template • Assign to SIEF based on 3.10 Id. • Communicate • Allocate SIEF facilitator IdentifysimilarSubstances Pre- Registr.data ‘Contacts’ List Agency Industry Pre- Registrationdossiers SIEF AllocatePre-SIEF Facilitator SIEF Formation Data Exchange Study Substance Id. Analysis WERCS EU User group 2007 – Erwin Annys

  17. Thanks for your attention WERCS EU User group 2007 – Erwin Annys

More Related