1 / 8

SEMICON West 2006 STEP Methods to Measure/Improve Equipment Productivity

SEMICON West 2006 STEP Methods to Measure/Improve Equipment Productivity. Revision Plans for SEMI E10 / E35 / E58 / E79 / E116 / E124 David L. Bouldin Texas Instruments Incorporated d-bouldin@ti.com. Revision Plans for SEMI E10.

oshin
Télécharger la présentation

SEMICON West 2006 STEP Methods to Measure/Improve Equipment Productivity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SEMICON West 2006 STEPMethods to Measure/Improve Equipment Productivity Revision Plans for SEMI E10 / E35 / E58 / E79 / E116 / E124 David L. Bouldin Texas Instruments Incorporated d-bouldin@ti.com

  2. Revision Plans for SEMI E10 SEMI E10-0304ESpecification for Definition and Measurement of Equipment Reliability, Availability, and Maintainability (RAM) • E10 Revision Task Force (TF) working on revision to: • Convert the multi-path cluster tool RAM metrics into official E10 metrics vs. supplementary ones. • Harmonize terminology between E10 and E79. • Plan to Yellow Ballot during Spring 2007 cycle. SEMICON West 2006 STEP

  3. Revision Plans for SEMI E35 SEMI E35-0305 Guide to Calculate Cost of Ownership (COO) Metrics for Semiconductor Manufacturing Equipment • Equipment COO TF working on revision to: • Add new content on how to handle calculating COO for measurement, inspection, and test equipment. • Add more inputs/guidance related to environmental, health, and safety (EHS) cost elements. • Plan to Yellow Ballot during Fall 2006 cycle. SEMICON West 2006 STEP

  4. Revision Plans for SEMI E58 SEMI E58-0703Automated Reliability, Availability, and Maintainability Standard (ARAMS): Concepts, Behavior, and ServicesandSEMI E58.1-0697 (Reapproved 0703)SECS-II Protocol for Automated Reliability, Availability, and Maintainability Standard (ARAMS): Concepts, Behavior, and Services • No active TF currently working on revision. • Due for mandatory 5-year review in 2008. SEMICON West 2006 STEP

  5. Revision Plans for SEMI E79 SEMI E79-0304Specification for Definition and Measurement of Equipment Productivity • Equipment Productivity Metrics TF revising to: • Redefine “virtual machines” with reference to fundamental quantities: theoretical production time, equipment uptime, and total time, but without changing calculation results. • Harmonize terminology between E10 and E79. • Make significant editorial changes for clarity and consistency. • Yellow Balloted during SEMICON 2006 cycle. SEMICON West 2006 STEP

  6. Revision Plans for SEMI E116 SEMI E116-0706 Provisional Specification for Equipment Performance TrackingandSEMI E116.1-0706Specification for SECS-II Protocol for Equipment Performance Tracking • TF completed original standards in 2002 and 2003. • TF completed latest revisions in early 2006 and discharged. • Due for mandatory 5-year review in 2011. SEMICON West 2006 STEP

  7. Revision Plans for SEMI E124 SEMI E124-1103Provisional Guide for Definition and Calculation of Overall Factory Efficiency (OFE) and Other Associated Factory-Level Productivity Metrics • No active TF currently working on revision, but plan to reactivate Factory Productivity Metrics TF to: • Remove Provisional status. • Harmonize terminology with E10 and E79. • Due for mandatory 5-year review in 2008. SEMICON West 2006 STEP

  8. Legend C Chair/Co-Chair L Leader TF Task Force SE Standards Engineer TA Technical Architect TE Technical Editor SC Subcommittee VC Vice Chair NA METRICS COMMITTEE (SC129) C: David Bouldin – TIC: Tom Pomorski – Brooks Automation C: TBD TE: Carolyn Busing – Self TA: TBD SE: Susan Turner– SEMI ESD/ESC TF L: Arnold Steinman – Ion Systems Factory Level Prod. Metrics TF (Inactive) E10 Revision TF Equipment Documentation TF Metrics Education/Adoption SC RF Diagnostics TF Equipment Productivity Metrics TF EMC TF Film Mechanical Testing TF L: David Bouldin – TI L:Kevin Lanham – TEL L: Tom Pomorski – Brooks Automation L: Lisa Pivin – Intel L: John Pace – Si Automation L: John Caughman – ORNL L: Jeff Lexa – Bird L: Sal DiIorio – Semi-Tech Group L: Michael Werre – Intel L: Ron Billings – FABQ/ Ga. Tech. L: Jim Irwin – Irwin Consulting L: Tom Pomorski – Brooks Automation L: Andrew McKerrow – TI L: TBD L: Vladimir Kratz – Credence L: Mark Frankfurth – Cymer Equipment COO TF Measurement Systems Analysis TF International Environmental Contamination Control TF L: TBD L: TBD L: Daren Dance – WWK L: David Bouldin – TI L: Jürgen Frickinger– Fraunhofer-IISB L: Mikio Furukawa – Shin-Etsu Polymer L: Rob Henderson – Yield Service Int’l SEMI NA Metrics Technical Committee E35 STEPs E10 E79 E124 SEMICON West 2006 STEP

More Related