The GONG Ha Instrument Prototype Design Review is a technical critique of the design, functionality, and performance of the GONG Ha Prototype System. The review aims to assess if the system meets observational requirements and identify any areas that may require improvement or attention. The committee will prepare a written report addressing these concerns.

osorio
Télécharger la présentation

GONG H α Instrument Prototype Design Review September 22, 2009

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GlobalOscillationNetworkGroup National Solar Observatory 950 N. Cherry Ave., Tucson, Arizona 85719 GONG HαInstrument Prototype Design Review September 22, 2009

  2. Agenda September 22, 2009 8:30 – 9:00 Coffee & pastries 9:00 – 9:10 Introduction (Eliason) Part I: Prototype Instrument 9:15 – 10:00 GONG Ha Instrument (Harvey) 10:05 – 10:30 Data Acquisition System (Luis) 10:30 – 10:45 Discussion 10:45 – 11:00 Break Part II: Software Status 11:00 – 11:30 Real-time Software (Purdy) 11:30 – 12:00 Near-realtime Software (Bolding) 12:00 – 12:15 Discussion 12:15 – 1:15 Lunch Break (catered) 1:30 – 2:00 Closed Session: Review Committee 2:00 – 2:30 Committee Report and Wrap-up Discussion

  3. Background • Discussion with AF Weather Directorate, April 14, 2008, Pentagon, Hill, Keyser, Lewis, Stoffler, and Zettlemoyer. • Statement of Work submitted to AFWA July 30, 2008, “GONG as a Backup System for AFWA’s O-SPAN Space Weather Network”. • AFWA – NSF transfer of funds December 17, 2008 • Phase I: Adding Hα Observations to the GONG Instruments • Phase II: Continued operations to supply AFWA with Hα filtergrams, magnetic field, and helioseismic data

  4. Phase I: Schedule Overview with Key Dates

  5. Charge to the Review Committee The purpose of this technical review is to provide the GONG Program with an expert critique of the design, functionality, and performance of the GONG Ha Prototype System. • Have we demonstrated that the Ha Instrument and Data Acquisition System meet the observational requirements to serve as a backup system for AFWA’s ISOON Space Weather Network? • Is the design reasonable or are there areas that could be improved or simplified? • Are there elements of the design that might be prone to failure in a 5+ year operation? • Are there areas that should receive special attention when testing the production systems? ***** We would like the committee to prepare a brief written report, which should address our concerns noted above, as well as any issues that may come up during the review or during the committee’s meeting. Although not the focus of this review, if there is relevant feedback regarding the Software Status presentations, it should also be included.