An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ELI ALPS – needs, expectations and constraints Ervin Racz HEPTechWorkshop, Prague 7th April, 2014

  2. Outline • Mission • Strategy • Design of ELI ALPS • Schematics of ELI ALPS • Implementation • Personnel

  3. Mission, general aims

  4. Missions of ELI-ALPS • Togenerate X-UV and X-ray fs and attopulses, fortemporal investigation at the attosecond scale of electron dynamics in atoms, molecules, plasmas and solids. • ATTOSECOND Beamlines & UserFacility • 2) Tocontributetothetechnologicaldevelopmenttowards 200PW • HIGH INTENSITY beamline

  5. ELI-ALPS Lightsources The shortestpulsedurationsatthewidestspectralrange … … atthehighestrepetitionrate.

  6. Strategy

  7. General Stategy of Implementation Supportedby EU RegionalFunds (85%) Cumbersome and complicatedburocraticprocessesandorganizations Legalform – company (ELI-Hu Nonprofit Ltd.) - Rare (atleastin Hungary) - Advantages: flexible, clearrules, non-governmental establishment, efficientorganisation - Disadvantages: logics of scientific and financialaredifferent, no tenuretrack (inclassicsense), … National environment (in Hungary): - 3 electionsin 2014 (temporaryeffect, withshortdecaytime) - Economy is justto start growingslowly - The project is in focus– flagship EU and innovation project (Far thelargestsciencerelatedexpenditure in Hungary since 50s’.)

  8. ScientificStategy of Implementation Specs and basicdesignscoordinatedbyELI-Hu Nonprofit Ltd. Minimize”on site” developmentsduringPhase 1 Make R&D contractstoplace of expertise(Research Institutes, Universities, and Industries) Makeindustrialcontracts Custom made systemsatthecuttingedge Solve HR problems(Spreadgraduates and postdocsto R&D places toparticipateinkeydevelopments & products.)

  9. Designs of ELI ALPS • Conceptual Design Report • Technical Design Report • Collaborations

  10. Design of ELI-ALPS I Mission Basic scientificdirections ELI-PP Docavailablefromthewebsite ELI-PP White Book ELI-ALPS July 2010 – December 2010 FeasibilitystudyfortheScientificCase of ELI-ALPS March 2011 – June2011 PlannedresearchActivities of ELI-ALPS Feasibilitystudy of ELI-ALPS – part of project applicationtothe EU.Completed: June, 2012

  11. Design of ELI-ALPS II. Conceptual Design Report Part I (sources, science and IT) Conceptual Design Report by the international community Part II (labs, workshops) is due Q2 2014 • By Research Institutes and Universities Status: primary and secondarysourcescompleted, measurementscompleted SAC approved Undercompletion: preparation, diagnosticslabs, workshop, facilityissues

  12. Design of ELI-ALPS III Technical Design Report Technical design (TDR)bythecontractors Part I is dueby Q4 2014 • Bymainlyindustrialpartners

  13. Collaborationwithindustryand Academia Major areas Lasers, optics, mechatronics, X-ray, THz sources, particles, diagnostics, vacuum technology, sci IT, control-command, safety) Clusters • In Hungary: platform for laser technology (later on is cluster form) • cluster for ELI-related training(supported by national sources by 3M€, between 2013-15) • In Europe: direct & indirect contacts Intellectual Property (IP) issues • No direct IP acquisitionpossibility. • Support targeted R&D - create IP. • Legal issues: balance between the needs of ELI-ALPS, interest of the industry, and the EU / national laws on public money.

  14. Schematics of ELI ALPS • General Scientific Scheme • Lasers • Secondary Sources

  15. Schematics of ELI-ALPS

  16. Schematics of thelasers

  17. Schematics of ELI-ALPS

  18. Secondarysources Gas High Harmonics Generation and Attosecond Pulses 1kHz-100kHz, 4-400eV, upto 10 µJ Solid High Harmonics Generation and Attosecond Pulses 5Hz – 1kHz, 10eV – 5keV, uptomJ THz sources3MV/cm – 100MV/cm, upto1mJ New Concepts for HHG and Attosecond Pulse Generation Electron and Ion Acceleration (to support regional sciences only)e-: 1-2GeV, 0.2nC; p+: upto 160MeV, upto1nC

  19. Implementation • Overview • Implementation of lasers(R&Ds) • Implementation of secondarysources(R&D and publicprocurements) • Scientificareas (layout) • Budget

  20. Implementationplan Overview

  21. Implementation of thelasers Stage 1by 2015 Cuttingedgelasersby2017 ALPS HighRepetitionRate (HR) beamline 100kHz, >5mJ, <5fs, VIS-NIR, CEP >1mJ, <7fs ALPS SingleCycle (SYLOS) beamline 1kHz, >100mJ, <5fs, VIS-NIR, CEP >4TW, <20fs ALPS High Field (HF) beamline Ti:S duty end: 5Hz, >2PW, <20fs, NIR 100Hz, 0.5J, <12fs, NIR >1J, <20fs ALPS Mid-InfraredSource (MIRS) 100kHz, >100J, fewcycle, @ 3m

  22. Implementation of thelasers 1. Via R&D projects 2. Public procurement – Q4 2013 3. Laser R&D projectsforelimination of technologicalbottlenecks Q4 2013 4. Public procurement – Q4 2014

  23. Implementation of thelasers I. 1. Via R&D projects ALPS MIR laser 100kHz, 0.1mJ, <6 (3)cycles, MIR ALPS HR laser 100kHz, >1 (5mJ), <5 (7)fs, VIS-NIR, CEP Q1 2016 Deliverytothe site Q4 2015 ForeseeablecontractingdateareApril / May, 2014

  24. Implementation of thelasers II. 2. Public procurement(contracts: end of May) – Q4 2013 ALPS Sylos 1 laser 1kHz, >4TW, <20fs, VIS-NIR, CEP ALPS HF PW laser ≤5Hz, >2PW, <20fs, NIR Q1 2016Deliverytothe site Q2 2016 3. Laser R&D projectsforelimination of technologicalbottlenecks 4. Public procurement – Q4 2014 ALPS Sylos 2 laser 1kHz, >20TW, 5fs, VIS-NIR, CEP ALPS HF 100 laser 100Hz, >40TW, <12fs,NIR Q4 2016 Deliverytothe site Q3 2016

  25. Laser R&D projects 2013-2014 • Aim is tosupportalready ONGOING experimental (modelling) researchesto: • Explorethelimitation of a technology / process • Find / excludesolutionsfor a technologicalbottleneck(s) Callforproposals: W48 2013 – W10 2014 Contracts: Aplil 2014 Total budget: 2M€

  26. Laser R&D projects 2013-2014 • Development of (diodepumped) pumplasers • (100 Hz, 1 kHz, 0,6 ps – 2 ps, 1J) HF 100, THzpump, Sylos 2 HF 100, Sylos 2 • Nonlinearopticalmethods • (OPCPA (stabilization, bandwidth, technology), SFG, HCF, XPW) HF PW, HF 100, Sylos 2 • Temporalcontrastissues • (OPCPA, highreprateplasmamirror, spatio-temporalfocusing)

  27. Implementation of the secondarysources Via R&D projects – Q1 2014 TDR of thebeamlines TDR of thetargetareas Delivery I: Q3 2014 Delivery II: Q2 2015 Public procurements – Q4 2014 Hardware forthebeamlines Hardware forthetargetareas Delivery I: Q3 2015 Delivery II: Q2 2016 Bythesamegroups / contractors+ ELI-ALPS workforces Via R&D projects – Q1 2015 Implementation of thebeamlines Implementation of thetargetareas Delivery I: Q1 2016 Delivery II: Q4 2017

  28. Procurements Types of procurements R&D procurement (goods / serviceswithdominantR&D part) Public procurements (commerciallyavailablegoods / services) Governinglaws and rules Hungarianlawonpublicprocurements(mind thestrictness!) Rulesrelatedto EU RegionalDevelopment and StructuralFunds Publicity The yearlyprocurementplanavailablefromthewebsite(underenhancement) Allcallsavailablefromthe web site: publicprocurementsvia link to TED; R&D callsdirectly

  29. Procurementsin 2014 Public Procurements Sylos 1, and HF PW lasers(inprogress) Control-commandsystems(plannedtolaunchin Q3) LaserDiagnostics(plannedtolaunchin Q4) Vacuumcomponents(plannedtolaunchin Q4) Specialoptics and detectors (HHG) (plannedtolaunchin Q4) • R&D Procurements • HR and MIR lasersystems(inprogress) • Laser R&D programmes(inprogress) • Design and assembly of GHHG beamlines(inprogress) • Design and assembly of THzsources(inprogress) • Design and assembly of SHHG beamlines(plannedtolaunchin Q2) • Uniquelaserdiagnostics(plannedtolaunchin Q2) • Design of particlesources(plannedtolaunchin Q2)

  30. Phasing and draftbudgetingResearch technology Phase 1 (-2015) Primarysources: 20.3 M€ Secondarysources: 10.8 M€ Labs, workshops: 1.65 M€ Scientific IT 0.39 M€ Phase 2 (-2017) Primarysources(incl. THzpump): 29.0 M€ Secondarysources: 15.1 M€ Labs, workshops: 7.0 M€ Scientific IT 2.03 M€

  31. LAYOUT Scientificareas • Laser hall: 1350 m2 • Target areas: 2100 m2 • Optics labs: 330 m2 • Biology/chemistry/medical labs: 320 m2 • Diagnostics labs: 110 m2 • Mechanical workshops: 530 m2 • Electric / IT workshop: 200 m2

  32. Personnel

  33. R&D personpowerplanning Planned 2016 Status Q1 2014 Leading & seniorscientist: 47 39 persons (16 FTE) Junior scientists: 76 10 persons (9 FTE) Engineers & technicians: 32 16 persons (14 FTE)

  34. Scientific Management L. Lehrner D. Charalambidis K. Osvay T. Kecskés, A. Varga D. Charalambidis K. Osvay S. Brockhauser G. Sansone E. Cormier M. Kalashnikov R. Lopez-Martens Z. Várallyay A. Andreev P. Ranitovic S. Varró … K. Hideghéty … P. Antici P. Dombi S. Kahaly N. Lopes J. Fülöp E. Rácz P. Tzallas K. Varjú K. Bodor L. Fülöp Sz. Szállási …

  35. Thankyouforyourattention!