1 / 4

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [ Resolution of TG6 Draft D0 comment S7-530 ] Date Submitted: [ 2 nd September, 2010 ] Source: [ Ranjeet Kumar Patro ] Company [ Samsung Electronics ]

Télécharger la présentation

Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project: IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [Resolution of TG6 Draft D0 comment S7-530] Date Submitted: [2nd September, 2010] Source: [Ranjeet Kumar Patro] Company [Samsung Electronics] Address [Bagmane Lakeview, Block ´B´, No. 66/1, Bagmane Tech Park, C.V. Raman Nagar, Byrasandra, Bangalore, Karnataka, 560093, India] Voice:[+91 80 4181 9999], FAX: [+91 80 4181 9999], E-Mail:[rkp.atd@samsung.com] Re: [Proposed Resolution of D0 Comment S7-530] Abstract: [Description of document contents.] Purpose: [Description of what the author wants P802.15 to do with the information in the document.] Notice: This document has been prepared to assist the IEEE P802.15. It is offered as a basis for discussion and is not binding on the contributing individual(s) or organization(s). The material in this document is subject to change in form and content after further study. The contributor(s) reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor acknowledges and accepts that this contribution becomes the property of IEEE and may be made publicly available by P802.15. NOTE: Update all red fields replacing with your information; they are required. This is a manual update in appropriate fields. All Blue fields are informational and are to be deleted. Black stays. After updating delete this box/paragraph. <Ranjeet Kumar Patro>, <Samsung Electronics>

  2. Proposed Resolution of D0 Comment S7-530 <Ranjeet Kumar Patro>, <Samsung Electronics>

  3. D0 Comment S7-530 • Comment: The three lengths of BP/4*PN_m(n+1), BP/4*PN_m(n+2), BP/4*PN_m(n+3), do not match in the figures • Commentators proposed resolution: Can we modify the figure • Must be satisfied: • Note: It was categorized under Editorial, it seems to be a technical comment. <Ranjeet Kumar Patro>, <Samsung Electronics>

  4. Proposed Resolution • Resolution: Reject • Description: The three lengths correspond to beacon transmission time offset in three beacon periods. They are supposed to be different and that is the main idea behind Beacon Shifting. It seems that Figure 87 is illustrated with PN4(n), that can be explicitly mentioned in the figure. <Ranjeet Kumar Patro>, <Samsung Electronics>

More Related