1 / 8

Status of Torino-Dubna Production

Status of Torino-Dubna Production. Aluminum Plates production: Torino: steady production ongoing, 2715 plates cut, 194 chambers= 48 MB1 + 54 MB2+ 50 MB3+ 41 MB4).

Télécharger la présentation

Status of Torino-Dubna Production

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status of Torino-Dubna Production • Aluminum Plates production: • Torino: steady production ongoing, 2715 plates cut, 194 chambers=48MB1 +54MB2+50MB3+41MB4). • Dubna: steady production ongoing. Plates for 34 MB1, 40 MB2, 39 MB3, 3 MB4 produced insofar (116 total). Time estimated to complete full production + spares march 2005 (as specified in the contract). amedeo.staiano@to.infn.it

  2. Status of Torino-Dubna Production Position Quality of strip production: stable since change of strip deposition head in august 2002. Plate MB1 n. 300220 1 pixel = 0.106mm amedeo.staiano@to.infn.it

  3. Status of Torino-Dubna Production HV test performance of strip production: Plates which pass 1st HV test 84% Last plate of the day left under HV test during the night, 10 hours. No extra bad plates found so far. amedeo.staiano@to.infn.it

  4. Status of MB4 Production Preparation • Production of FE and HV SL frames ongoing in Torino. 20 MB4 HV side + 9 FE side frames produced. amedeo.staiano@to.infn.it

  5. Status of MB4 Production Preparation Plotter Y axis supports 99% ready for table installation. Completion expected by delivery of last part (rails protective tape fixations). amedeo.staiano@to.infn.it

  6. Status of MB4 Production Preparation I beam tool drawings (P.Mereu) Inflatable tube (2.5m,f=7.5mm) Elastic rubber OPEN 12.7 mm ALCOA support Commercial profile CLOSED amedeo.staiano@to.infn.it

  7. Status of MB4 Production Preparation Final prototype executive drawings ready Movable locating block Rails Torsion springs amedeo.staiano@to.infn.it

  8. Status of MB4 Production Preparation Main Structure: Rohacell Sandwich Thickness 500mm Load 5000N amedeo.staiano@to.infn.it