1 / 6

VLBA Sensitivity Upgrade Project Status

VLBA Sensitivity Upgrade Project Status. Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4 . Project Goal. Expand the VLBA’s data-path bandwidth to 4 Gbps by 2011.

sheera
Télécharger la présentation

VLBA Sensitivity Upgrade Project Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. VLBA Sensitivity UpgradeProject Status Jon Romney NRAO, Socorro 7th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4

  2. Project Goal Expand the VLBA’s data-path bandwidth to 4 Gbps by 2011 Goal has been widely and frequently announced within the radio astronomy, astrometry, and geodesycommunities. VLBA users are waiting to exploit it to enable a variety of compelling new science. 7th US VLBI Technical Coordination Meeting

  3. Implementation • Goal Corresponds to: • 2 IFs @ 500 MHz BW @ 2-bit Nyquist samples • [i.e., retaining VLBA’s original IF system.] • New Elements • RDBE sampler/filter unit. • Mark 5C recording system. • DiFX software correlator. 7th US VLBI Technical Coordination Meeting

  4. Project Status • DiFX Software Correlator Operational • Comparisons with original VLBA correlator yielded excellent results. • Exactly matched integrations show amplitude and phase agreeing far better than realistic expectations. • Science use cases, analyzed by expert VLBA users, finding primarily limitations of data-analysis algorithms, not problems in correlator results. • DiFX alone enables some new scientific techniques. • High spectral resolution. • Wide-field imaging. • Special pulsar processing. • Announced for correlation of all observations proposed Oct. 1. • Observation trimester beginning mid-January. • Planning to ramp up use beginning as soon as possible. • But DiFX can’t really come into its own without wideband observations. 7th US VLBI Technical Coordination Meeting

  5. Status, continued • RDBE & Mark 5C • Absolutely central to achieving 4-Gbps goal. • Some initial efforts successfully behind us: • ROACH final design, layout, exhaustive testing, beginning of production. • Mark 5C concept design, development and production of 10 Gig E interface mezzanine board. • But both efforts have encountered schedule slippages, sufficient to become serious concerns. • Both NRAO &Haystack have major competing priorities: EVLA & MWA. • Conduant also? • To recover schedule, we need to consider alternative approaches, possibly including • Additional personnel resources. • (Matt Luce recently joined NRAO team, for FPGA development.) • Simplified, less comprehensive design “at least initially”. • We hope to revisit these points throughout this meeting! 7th US VLBI Technical Coordination Meeting

  6. Thank You 7th US VLBI Technical Coordination Meeting

More Related