1 / 1

Page 1 of 1

Engineering & Construction Management Department. March Report , 2011. Project . General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting.

shen
Télécharger la présentation

Page 1 of 1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Engineering & Construction Management Department March Report, 2011 Project General Project Description: Park design to include parking area, pathway, rock wall for playground area, wood fiber surface, picnic shelter, bike rack, park signs, landscaping, irrigation, and lighting. Proposed park area PROJECT SCHEDULE Design Status: Complete Pending Issues: None Overall Project Budget: $799,847.40 Funding Source(s): Parkland Dedication Fees/Grant Project Contact Project Manager: Yvette Hernandez 541-4200 Design Consultant: AIA Engineers, LTD Page 1 of 1

More Related