1 / 12

Proposal for tasks and schedule

Proposal for tasks and schedule. Coordination is needed Tasks Tools Topics Which areas are not covered Manpower versus needs Complementary observations Tools and methods End to end simulation Prototype of reduction. Questions (I). Selection function

sitara
Télécharger la présentation

Proposal for tasks and schedule

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal for tasks and schedule • Coordination is needed • Tasks • Tools • Topics • Which areas are not covered • Manpower versus needs • Complementary observations • Tools and methods • End to end simulation • Prototype of reduction DMS/PS organisation

  2. Questions (I) • Selection function • Should we go fainter in magnitude (larger mass ratios) • In MBP/Spectro and in astro • Which choice in dense areas • How to organise the future DMS data processing • Rejection from core processing • Various categories of DMS • Concurrential methods DMS/PS organisation

  3. Questions (II) • Impact of binarity on spectro design • Resolution and SB2 (simulation with correct instrumental effects - in progress) • Someone from the RVS group could come into the DMS group? • Impact of binarity on MBP design • Interacting binaries • Classification of unresolved binaries • Need of interface with the photometric group? DMS/PS organisation

  4. Overall mission schedule 2000 2004 2008 2012 2016 2020 Acceptance Techno. development Build, Test Launch Observations Analysis Catalogue DMS/PS organisation

  5. Prio 1A: the satellite design • On-board detection • Detection algorithm Arenou/Babusiaux -> SEPT 02 • Detection limits for multiple objects • Sample and patch study • Optimise sampling windows and observing Söderhjelm • strategy(at different magnitudes) Söderhjelm • MBP/Spectro simulations • Spatial resolution problems (large pixels!) • Binarity effects for the filter selections • Spectral resolution for efficient SB detection • Random & systematics for bright stars • gain (Short term: - september 2002, PDHE study) Long term: - early 2005, design frozen (much before, because of testing) DMS/PS organisation

  6. Prio 1B: multiple stars in simulations and reductions • Galaxy model • Binaries/multiples in simulations • Prototype single-star reduction • Rejection of multiples • Database principles (multiple star/individual component boundaries) DMS/PS organisation

  7. Prio 2A: assessing the scientific capabilities • Simplified reduction simulations • Semi-realistic astrometric errors S. Söderhjelm • BBP Photometric errors • Resolution limits • Curved proper motion detection limits • SB detection limits • Eclipsing binaries detection limits • Galaxy modelling with multiple stars • Expected numbers and accuracies for multiple star observations with GAIA • Evolutionnary models DMS/PS organisation

  8. Prio 2B: dedicated DMS reduction algorithms • Reduction simulation with no a priori knowledge • Resolved doubles • Reduction simulation with period-finding • Resolved binary orbits • Astrometric binaries orbits D. Pourbaix • SB orbits • Extrasolar planet orbits • Eclipsing binaries/transits N. Robichon • Reduction simulations for multiple stars • Resolved multiples • Astrometric binaries in resolved binaries • Eclipsing Binaries in resolved binaries • (+arbitarily long list of special cases...) DMS/PS organisation

  9. Prio 3: Science Case • Uniqueness (or not) of the GAIA results • Stellar masses • Binary statistics • Binary origin and evolution • … DMS/PS organisation

  10. Organisation • Put names on task responsibilities • Reference document (short term) • Publication plan • technical • Scientific: increase Gaia visibility • Next meeting • Parallel meeting in Monte-Rosa? • 13-14 Sept DMS/PS organisation

  11. Actions • Activate PS web page • F.A. • Give simulated data for orbit determination • First agree on protocol • F.A./C.B. • Blind tests for orbits • Dimitri • Alessandro • Hans-H • What people can give, what they request for simulations • All • Mario+Dimitri to agree on protocol and to contact Carine for simulations • ML: circulate a page DMS/PS organisation

  12. Thanks • To Annick Oger and Pascal Hammes for the logistics • To Staffan for the scientific organisation • To your contribution (to be sent by email…) DMS/PS organisation

More Related