1 / 16

Canadian Marine Program

Canadian Marine Program. Yvonne Cook LCM Surface Networks Gerie-Lynn Lavigne LCM Marine Network. New Staff Members. Gerie-Lynn Lavigne Life Cycle Manager Champika Gallage Standards Officer 4 new PMO’s being trained up. AVOS. 38 operational 29 selected 9 supplementary (no SST)

slofton
Télécharger la présentation

Canadian Marine Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Canadian Marine Program Yvonne Cook LCM Surface Networks Gerie-Lynn Lavigne LCM Marine Network SOT lV Geneva Swtzerland, April 16-21, 2007

  2. New Staff Members • Gerie-Lynn Lavigne Life Cycle Manager • Champika Gallage Standards Officer • 4 new PMO’s being trained up SOT lV Geneva Swtzerland, April 16-21, 2007

  3. AVOS • 38 operational • 29 selected • 9 supplementary (no SST) • 1 training unit at CCG • 1 Engineering unit • Sparing Procurement • 25 ready for ship selection & installation • Software upgrade • includes IMMT3 & MQCS5 • EPROM burning on hold • Data download from ships • Download Instructions need final testing and implementation • Shared drive for PMO’s SOT lV Geneva Swtzerland, April 16-21, 2007

  4. SOT lV Geneva Swtzerland, April 16-21, 2007 May 2006

  5. SOT lV Geneva Swtzerland, April 16-21, 2007 Sept 2006

  6. VOSClim Status 38 Ships registered • 9 without SST? SOT lV Geneva Swtzerland, April 16-21, 2007

  7. Pub47 Update • August 2006 update of limited use due to format issues & suspect data • April 2007 file contains significant changes • Formatted to version 3 • All ship data updated and confirmed • Photos & CD’s SOT lV Geneva Swtzerland, April 16-21, 2007

  8. AVOS demography • 19 Canadian Coast Guard (CCG) • 50% of present AVOS fleet • CCG ships selected because of routing through the Arctic (data sparse area) and quality of technical staff • Remainder of Fleet • Containers and car carriers • Regular routes • Intercontinental • Etc. SOT lV Geneva Swtzerland, April 16-21, 2007

  9. Stealth Mode • CCG • Will not accept ‘SHIP’ or masked Ident • Enabled permanent stealth on all CCG AVOS • MSC working on solution • All CCG observations • North of 60N will be transmitted to WMO • South of 60N will not be transmitted to WMO unless encrypted • Developing SM encryption SOT lV Geneva Swtzerland, April 16-21, 2007

  10. VOS Optimization Steps & Experiences • Optimization Letter • Equipment handover letter • Approx 50 ships still to handle • Great Lakes Shipping • E-mail transmissions have been offered by owners • No inspection by EC PMO’s • No PMO Support SOT lV Geneva Swtzerland, April 16-21, 2007

  11. ISO • MSC going ISO9001:2000 • Technical Workgroups chaired by Standards officers & LCMs • System manual from Manufacturer • Draft Maintenance & Inspection (MSC) • Draft Inspection check-sheets (MSC) • WBS (Weather Buoy System) • Internal web site • Captures all AVOS obs • Generates monthly stats SOT lV Geneva Swtzerland, April 16-21, 2007

  12. Iridium Pilot Project • Prototype Iridium AVOS • One of 3 Possible Vessels • Amundsen CGDT (Research Vessel) • DesGroseiliers CGDX • Pierre Radisson CGSB • Data communications • Path must be as much Canadian as possible • through EC SOT lV Geneva Swtzerland, April 16-21, 2007

  13. Thank You Merci! SOT lV Geneva Swtzerland, April 16-21, 2007

  14. Other Marine Topics • IABP • 2 Ice Beacons annually • 5 extra in support of IPY • North Atlantic buoy monitoring support • 2 annually • 2 extra 2007 • North Pacific buoy monitoring support • 10 planned for spring 2007 NAVO deployment • 14 planned deployments by VOS • Continued support of 45 operational moored buoys • Buoy Developments • Purchase of three 3meter foam hulls • Problems with construction of superstructure • Future Contracts in the Canadian marine program are under jurisdiction of the National Procurement Review Board SOT lV Geneva Swtzerland, April 16-21, 2007

  15. SOT lV Geneva Swtzerland, April 16-21, 2007

  16. SOT lV Geneva Swtzerland, April 16-21, 2007

More Related