1 / 16

BL 5.3.2.1 Mechanical Design Review

BL 5.3.2.1 Mechanical Design Review. Beamline Requirements. BL 5.3.2.1 is to utilize the design of the existing BL 5.3.2 to the greatest extent possible. BL 5.3.2.1 will utilize existing (given) pumps and vacuum valves. BL 5.3.2.1 must utilize existing space between BL 5.3.1 and BL 5.3.2.

smithjacob
Télécharger la présentation

BL 5.3.2.1 Mechanical Design Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BL 5.3.2.1 Mechanical Design Review

  2. Beamline Requirements • BL 5.3.2.1 is to utilize the design of the existing BL 5.3.2 to the greatest extent possible. • BL 5.3.2.1 will utilize existing (given) pumps and vacuum valves. • BL 5.3.2.1 must utilize existing space between BL 5.3.1 and BL 5.3.2.

  3. Existing floor layout

  4. Port 5.3 Beamlines with BL 5.3.2.1

  5. Major Components and Assemblies • M1 Mirror • Entrance Slits • Grating Monochromator • Exit Slits • Microscope

  6. BL 5.3.2 M1 Mirror

  7. BL 5.3.2.1 M1 Mirror

  8. Existing 5.3.2 M1 Assembly

  9. Updated BL 5.3.2 and 5.3.2.1 M1 Mirror Assembly

  10. Entrance Slit

  11. BL 5.3.2 Grating Monochromator

  12. BL 5.3.2.1 Grating Monochromator

  13. BL 5.3.2 Grating Drive

  14. BL 5.3.2.1 Grating Drive

  15. Exit Slit Assembly

  16. Exit Slits