1 / 18

Towards a high quality 2011 Census The Census Field Operation and LA liaison

Towards a high quality 2011 Census The Census Field Operation and LA liaison. Pete Benton Deputy Director, Census Programme. Overview. Field operation aims Field operation design The key role of Local Authorities Address register development. 2011 Census aim.

sunee
Télécharger la présentation

Towards a high quality 2011 Census The Census Field Operation and LA liaison

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Towards a high quality 2011 CensusThe Census Field Operation and LA liaison • Pete Benton • Deputy Director, Census Programme

  2. Overview • Field operation aims • Field operation design • The key role of Local Authorities • Address register development

  3. 2011 Census aim • “To provide high quality, value for money population statistics as required by key users, on a consistent and comparable basis, for small areas and small population groups”

  4. Field operation objectives • Historically • Count everybody • But falling response rates over time • 2001 • Count as many as you can • Then adjust for undercoverage • 2011 • Count as many as you can • Do better in the worst 5% of LAs than 2001 • Minimise variability in response within LAs

  5. Overall response & CI with different levels of variability across enumeration districts 4.0% 3.5% 3.0% 7% variability 10% variability 2.5% 12% variability CI Width 15% variability 2.0% 1.5% 1.0% 70% 80% 90% 100% Census Response

  6. Challenge • Complex response goals • ‘Real time’, detailed management information needed • Flexible but simple field management approach needed

  7. Field operation design – overview (1) • Develop high quality address register • Barcode every questionnaire and link to an address • Post Out, Central Post back • 24 hour receipting, update questionnaire tracking info • Identify every non-responding address

  8. Field operation design – overview (2) • Team-based follow up • Large team areas where high response expected • Small team areas where low response expected • Predictive model built using 2001 census/CCS data • Divide non-responding addresses into ‘workloads’ • Low response areas – fewer addresses per person • High response areas – more addresses per person • Update allocations weekly • Subject of further development

  9. The key role of LAs • Contribute to address register development • Provide enumeration staff • Local publicity • Provide local accommodation / logistical support • Provide local area information on hard to count groups etc • Facilitate access to local community groups • Appoint Census Liaison Manager (Exec level) and Assistant Census Liaison Manager

  10. Strong partnership developing • CLIP census subgroup • LA liaison pilot in 2007 census test • Regional Champions • SOLACE • Workshops with LLPG regional chairs • Current Address register Pilot with 24 LAs • Liaison with LAs in 2009 census rehearsal

  11. LA Liaison - Rehearsal LAs • LA Liaison programme underway • First visits to Rehearsal LAs in April 08 • Lancaster, Newham, Isle of Anglesey • LA Census Liaison Managers confirmed • All 3 LAs enthusiastic and committed • Outline information about areas collected • Action plans being reviewed

  12. Address register development strategy • ONS matches 3 national address files • Royal Mail - PAF • IDeA - NLPG • Ordnance Survey – AL2 • Matching based on address reference, text and spatial relations • Mismatches sent to IDeA, RM and OS for resolution • Remaining mismatches sent to LAs for resolution • ONS checks addresses on ground in c. 30% of areas where most uncertainty remains • Ongoing change updates from OS and IDeA • Currently piloting with OS, IDeA and 24 LAs

  13. Partnership and Communications Working Arrangements for Success • National Address Register Steering Group setup to provide strategic direction • Ongoing dialogue and regular meetings with suppliers • Data sharing agreement signed by all parties for the pilot – a majorachievement which will support a future National Data Sharing Agreement • Communication to all LAs coming shortly from regional champion • Clear messages prepared; workshop 10th October

  14. Results from address matching • Projected target results presented in July 08 • ‘First cut’ results achieved by August 08 • ‘Second cut’ results achieved by September 08

  15. Challenges & Key lessons Learnt • Frequent synchronisation of address data from suppliers – from monthly to either weekly or daily • need to use latest versions of data • The importance of VOA and alias addresses in the matching process • Avoiding duplication of work already done by other parties • Improve LA boundaries in PAF • Estimate this will reduce unresolved addresses by 0.5 % • Incorporate matching processes of address data suppliers into ONS methodology to further improve Quality and Confidence in matching process

  16. Going Forward • Address matching has proved to be very successful • The real challenges going forward are: • Capturing New Addresses • Identify Multiple Occupancy • Consequently ONS is planning to conduct comprehensive Address Field Checking Exercises across circa 30% of the country • Current pilot will help development of predictive model to identify where to address check

  17. Address register timetable Nov 08 Pilot complete Dec 08 National address matching starts Through 09 Anomalies to national providers Through 09 Residue to LAs, by region Dec 09 LA resolution complete March 10 ONS address check starts Sept 10 Address check complete Nov 10 Address list to printers 27 March 11 CENSUS DAY

  18. Summary • Far more control of field operation • Refined objectives • Increased targeting of resources • Builds on 2001 experience • Address register and LA role are key • Message to LAs: • Appoint CLMs and ACLMs • Work on your address lists now to improve PAF consistency • Further communication coming soon …

More Related