1 / 6

Particles and Fields Package Pre-Ship Review October 30,31, 2012 7: Test Flow Dave Curtis

Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission. Particles and Fields Package Pre-Ship Review October 30,31, 2012 7: Test Flow Dave Curtis. The Art of Testing. No battle plan survives contact with the enemy. Colin Powell Battle is an orgy of disorder. George S. Patton.

svein
Télécharger la présentation

Particles and Fields Package Pre-Ship Review October 30,31, 2012 7: Test Flow Dave Curtis

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mars Atmosphere and Volatile EvolutioN (MAVEN) Mission Particles and Fields Package Pre-Ship Review October 30,31, 2012 7: Test Flow Dave Curtis

  2. The Art of Testing No battle plan survives contact with the enemy. Colin Powell Battle is an orgy of disorder. George S. Patton

  3. PFP Test History There have been a number of changes to the test plan as laid out at PER These have mostly been the result of issues discovered during testing that resulted in PFRs, rework, and retest The test plan was then continually being readjusted to work around these problems while optimizing use of shared facilities and personnel This also ate up all the schedule margin, so that not all instrument testing is completed at this time as originally planned Delivery of the bulk of PFP has been delayed ~2 weeks LM is aware of this and is planning accordingly At this point it looks like SWEA will be even later This also results in a requirement for a delta PSR to discuss the results of the remaining testing Planned for 11/19

  4. Package I&T

  5. Environments

  6. Tests Complete