Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014

Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014 . Photovoltaic power plants. We have a huge facade surfaces that can be used to make the power plant. Economic analysis of project. Investment cost. Instal power. 399.000 €. 372.00 kWp. Return on investment.

tambre
Télécharger la présentation

Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Photovoltaic power plants Niksic mill, Niksic, Montenegro April, 2014

  2. Photovoltaic power plants We have a huge facade surfaces that can be used to make the power plant

  3. Economic analysis of project Investment cost Instal power • 399.000 € • 372.00 kWp

  4. Return on investment Estimated period of retutn on investment is 7.5 years