1 / 26

Simulation and Modelling 2 – Problem Formulation

Simulation and Modelling 2 – Problem Formulation. Yumarsono Muhyi STMIK Supra Even Semester 2008/2009 May 12th, 2009. About Me. Yumarsono Muhyi Head of Information System Dept., STMIK Supra Undergraduate of Electrical Engineering, Telecommunication - ITB

tosca
Télécharger la présentation

Simulation and Modelling 2 – Problem Formulation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Simulation and Modelling2 – Problem Formulation Yumarsono Muhyi STMIK Supra Even Semester 2008/2009 May 12th, 2009

  2. About Me • Yumarsono Muhyi • Head of Information System Dept., STMIK Supra • Undergraduate of Electrical Engineering, Telecommunication - ITB • Management Magister, Sistem Informasi - UPN (final semsester dan thesis) • Research Field: Computation, Operational Research, Optimation, Simulation • y.muhyi@gmail.com (email and chat) • y.muhyi@yahoo.com (mostly chat) • 0856-9117-2669 / (021) 93131-633

  3. Lessons • Introduction • Formal Problem Statement • Orientation • Project Objectives

  4. 1. Introduction • Goal: understanding what is to be accomplished by performing the study. • The activities: • A formal problem statement • Orientation of the system • Establishment of specific project objectives

  5. 2. Formal Problem Statement • Goal: • Provide both the practitionerand the potential audience with a clearly understandable high-level justification for the simulation. • The goal including: • Increasing customer satisfaction • Increasing throughput • Reducing waste • Reducing work in progress

  6. Increasing Customer Satisfaction • Increasing customer satisfaction is of fundamental interest in any system involving service operations. • This type of system typically includes waiting or processing queues. • Reductions in queue time usually result in increased customer satisfaction. • Customer satisfaction may also involve delivering products when promised. • Reductions in the number of tardy jobs will reduce operating costs associated with the loss of goodwill and will increase customer satisfaction.

  7. Increasing Throughput • Increasing throughput involves the amount of products or number of jobs that can be processed over a given period of time. • This can involve the elimination or improvement of different process operations. • It can also include the identification and redesign of bottleneck processes.

  8. Reducing Waste • Reducing waste results in reduced operating costs and increased net profits. • Waste can be reduced throughreductions in spoilage and obsolescence. • Spoilage can involve processes that are time and temperaturecritical. • Obsolescence waste can result from an organization’s inability to bring its product to the marketon time.

  9. Reducing Work in Progress • Work in progress is work that requires further processing for completion. • Work in progress is commonlyfound in processes that require multiple discrete operations. • Work in progress typically requires storagebefore the next process can be carried out. • Reducing work in progress reduces process costs associatedwith resource capacity and storage requirements. • Large amounts of work in progress can result frominsufficient resource capacity or poor operating policies. • Reducing work in progress can decrease thespace needed for manufacturing or distribution facilities.

  10. Tools for Developing the Problem Statement • Fishbone/Cause-Effect/Ishikawa Chart • The Fishbone chart is also known as the cause-and-effect diagram, man–machine–material chart, andas the Isikawa chart (Suzaki, 1987). • The purpose of this chart is to identify the cause of the problem oreffect of interest. • Pareto Chart • The Pareto chart is a second technique to help the practitioner to develop the problem statement. • It may turn out that there are several sources or causes of the problem or problems ofinterest. • This is frequently referred to as the80–20 rule: 80% of the problem is caused by 20% of the factors.

  11. Fishbone Chart

  12. Pareto Chart

  13. 7 Basic Quality Control Tools • Histogram • Pareto Chart • Check Sheet • Control Chart • Flow Chart • Fishbone/Cause-Effect/Ishikawa Chart • Scatter Plot

  14. Histogram

  15. Check Sheet

  16. Control Chart

  17. Flow Chart

  18. Scatter Plot

  19. 3. Orientation • Goal: The practitioner’s familiarizing himself or herself with the system. • Orientation Process/Types: • Initial orientation visit • Detailed flow orientation visit • Review orientation visit

  20. Initial Orientation Visit • Goal: To obtain a high-level understanding of the basic inputsand outputs of the system. • It is important not to attempt to understand too much detail of thesystem in the initial visit. • After the initial orientation visit, the practitioner should immediately reflect on the major componentsof the process while recollection of the visit is still fresh.

  21. Detailed Flow Orientation Visit • Goal: An understanding of how the system operates. • The practitioner should make detailed notes on thesystem operation by recording: • The types of entities that are processed by the system • The number and type of queues • The number and type of system resources • The sequence of processes as experienced by the entities • How the system performance can be measured

  22. Review Orientation Visit • Goal: To ensure that the understanding of the systemoperation is consistent with the practitioners’ understanding of the system and/or flow chart.

  23. Tools for The Orientation • High degree of access to the system. • Recording devices: • Digital camera (pictures, photos) • Camcorder (video) • Tape recorder, mini recorder (sounds) • Computer activity recorder

  24. 4. Project Objectives • Project objectives are dynamic. • Common project objectives may involve • Performance-related operating policies • Performance-related resources policies • Cost-related resource policies • Equipment capabilities evaluation

  25. Decision-Making Tools for Determining Project Objectives • Brainstorming: to generate a storm of ideas • Brainstorming preparation • Brainstorming process • Electronic brainstorming (email, chat, forum, etc.) • Nominal group technique • Al of the participants have the opportunity to vote on what theybelieve is the most important project objective. All of the participants are given an equal number of voteto cast. • Delphi process • Serves the same function as the nominal group technique. All voting is conducted anonymously after the brainstorming session has concluded. The administrator distributes a list of all of the brainstorming ideas. Theparticipants then vote for a particular idea. At the end, the administrator retainsonly a set of the most popular ideas.

  26. The End • Discussion. • Question and answer. • Case study.

More Related