1 / 9

Agriculture Irrigation Hardware UES Measure Update

Agriculture Irrigation Hardware UES Measure Update. Regional Technical Forum April 16, 2013. Agriculture Irrigation Hardware Measure Overview. Current Category: Proven Current Status: Out-of-Compliance Current Sunset Date: April 2013

trey
Télécharger la présentation

Agriculture Irrigation Hardware UES Measure Update

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Agriculture Irrigation HardwareUES Measure Update Regional Technical Forum April 16, 2013

  2. Agriculture Irrigation Hardware Measure Overview • Current Category: Proven • Current Status: Out-of-Compliance • Current Sunset Date: April 2013 • Reason for Update/Review: Follow-up to OOC plan; and sunset date • Subcommittee Review: Yes - Ag Irrigation Subcommittee (notes)

  3. Measure Descriptions • Go to the following sections in the Summary tab in the proposed measure workbook: • Measure Properties • Measure Identifiers

  4. Summary of Updates • Changed measure category to “Small Saver” • Professional judgment is used • Recent regional program savings estimated at 1.0 – 1.5 aMW per year. • Incorporated data from recent studies: • Idaho field study (Neibling) • PacifiCorp program data (2006-2008; 2009-2011) • Most recent Farm and Ranch Survey • Measure Additions/Changes • Added a new measure: Tower Gaskets. • Combined the existing Nozzle measure, Low Pressure Regulator measure, and sprinkler head measures (5) into a new “sprinkler package” measure. • Changed measure specification to require the following components to be leaking: • Wheel/hand line: Impact Sprinkler, Gasket, Drain, Hub, Leveler (also malfunctioning) • Pivot/Linear move: Pivot boot gasket, (Tower gasket, too) • Reviewed these updates and all other inputs with subcommittee and made some edits, with consensus.

  5. Remaining Issues for RTF Discussion • Subcommittee members may have additional comments • We had just one subcommittee meeting, so subcommittee members wanted to reserve the right to bring up any remaining issues after they had a chance for a more thorough review (up to the day of the RTF meeting: today).

  6. Measure Analysis and Inputs Details • Go to the following sections in the Summary tab in the proposed measure workbook: • Constant Parameter • Energy Savings Estimation Method, Parameters and Data Sources • Measure Incremental Costs and Benefits • Measure Lifetime

  7. Summary of Changes • Savings • Gaskets, Drains, and Leveler increased significantly • Pipe Repair increased by 50%-100% • All other measures increased or decreased slightly. • Cost • No changes (except combined Sprinkler Package costs and added Tower Gasket measure cost) • Life • No changes • TRC Cost-Effectiveness • Drains and Levelers are now cost-effective • The new combined Sprinkler Package measure is cost-effective • The new Tower Gasket measure is cost-effective only in the Eastern Washington and Oregon region • Go to the Presentation tab in the proposed measure workbook for graphs of existing vs. proposed savings and TRC.

  8. Subcommittee Proposal • Approve the updates to the agriculture irrigation hardware UES measure; • Change the measure category to “Small Saver”; • Set the measure status to “Active”; and • Change the sunset date to April 2018.

  9. Decision “I _______ move to approve the updates to the agriculture irrigation hardware UES measure; change the measure category to “Small Saver”; set the measure status to “Active”; and change the sunset date to April 2018.”

More Related