Market observation, traffic organization features, Corridor VII The DC ‘ s contribution to the EUSDR. Pjotr S. Suvorov Budapest, September 17th, 2013 Danube Commission, Budapest. Scheme of main gauging stations for assessment navigational conditions.

Télécharger la présentation

Pjotr S. Suvorov Budapest, September 17th, 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Market observation, traffic organization features, Corridor VII The DC‘s contribution to the EUSDR Pjotr S. Suvorov Budapest, September 17th, 2013 Danube Commission, Budapest

  2. Scheme of main gauging stations for assessment navigational conditions Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  3. Scheme of main control points for monitoring fleet traffic and cargo flows Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  4. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  5. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  6. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  7. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  8. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  9. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  10. PERIODS OF INTERRUPTION OF NAVIGATION ON THE DANUBE SECTIONS CAUSED BY ICE PHENOMENA IN 2012 Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  11. Scheme of critical "bottlenecks" limiting navigation on the Danube, and announced projects • (as of 2009) • - Construction of retaining section • Implemented hydrotechnical projects without retaining schemes • Local hydrotechnical projects Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  12. Budapest, Vigadoter, June 2013 Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  13. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  14. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  15. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  16. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  17. Forecast of the traffic density for the Danube (2020) Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  18. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  19. Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  20. Cargo volumes transported through the Sulina channel in 2012 in tonnes Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013

  21. Thank you for your attention! Pjotr S. Suvorov Deputy Director-General for Development of the Danube Navigation Secretariat of the Danube Commission pjotr.suvorov@danubecom-intern.org H-1068 Budapest Benczurutca 25 Workshop 2013 - a prosperous future for the Danube navigation Budapest, September 17th, 2013