1 / 15

Old Main: Where it all Began!

Old Main: Where it all Began!. Current Status. 2005 Bond Budget Project Summaries Through 6-30-12. Current Bonding Status. Funds only available from 2005 bond $2.74M available for allocation in Peoria High School budget line.

yaholo
Télécharger la présentation

Old Main: Where it all Began!

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Old Main: Where it all Began!

  2. Current Status

  3. 2005 Bond Budget Project Summaries Through 6-30-12

  4. Current Bonding Status • Funds only available from 2005 bond • $2.74M available for allocation in Peoria High School budget line. • Only option to move funds would come from elementary renovation and construction project line ($12.1M available) • Currently planned $6.11M over original plan • $4.0 to $7.0 M reserved for school 33 • $5.0M to $8.0 M left available for movement Max movement of $6.69M due to 10% movement limitation Max total for project of $9.43

  5. Additional Considerations • Remaining funds in 2005 bond should be expended in the next 18 months • Based on current projects list, this should not be a concern • First sale of bonds from 2012 authorization scheduled to close in May of 2013

  6. Logistics of Project • Design-build recommendation for project • Original estimated expense of $4.2M for renovation for educational use • Did not include soft costs of 20% (5.04M) • Construction expenses have increased over past two years • Does not include FF&E • Timeline of12 months • 3 months for design • 3 months permits • 6 months construction

  7. Old Main History

  8. Future Farmers of America 1951

  9. New Beginnings! Vision for the Future! Non-Traditional School Core Academic Classes GCC/College Experience eCampus Distance Learning Alpha Classes –Life Skills PHS Electives/CTE Classes Student Learning Opportunities

  10. Center for Advanced Professional Studies (CAPS) Center for Advanced Professional Studies (CAPS)

  11. CAPS • A partnership between education, industry and the community. It is a rigorous professional immersion program for high school students. Blue Valley, Kansas

  12. CAPS Core Values • Innovative, ever-evolving thinking • Nurturing of deep interest and passion • Authentic professionalism • Collaborative teaching and learning • Rigor, achievement, excellence • Never stop inspiring and having fun

  13. CAPS Strands • Bioscience • Business, technology and media • Engineering • Human services

  14. CAPS Student Enrollment • 2009-2010 250 • 2010-2011 512 • 2011-2012 658 • 2012-2013 934

  15. Comments/Questions

More Related