FVTX Power and cabling – a work-in-progress

FVTX Power and cabling – a work-in-progress Task 1.0 – Pre-populate the Racks ( Boose /Lenz/Jimmy) Low Voltage Racks 2 (on order) Bias Voltage Rack 1 (shared with VTX) 1.1 Install the PHENIX power bucket 2 1.2 Install and wire the bulk power supplies (all components at BNL)

zofia
Télécharger la présentation

FVTX Power and cabling – a work-in-progress

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FVTX Power and cabling– a work-in-progress Task 1.0 – Pre-populate the Racks (Boose/Lenz/Jimmy) Low Voltage Racks 2 (on order) Bias Voltage Rack 1 (shared with VTX) 1.1 Install the PHENIX power bucket 2 1.2 Install and wire the bulk power supplies (all components at BNL) 1.3 Install the PHENIX LV distribution crates 2 Distribution crates/25 distribution modules ROC Power 8 PHENIX modules Pulser 2 PHENIX modules Opto-isolator 2 PHENIX modules Clocks 1 PHENIX module Wedge Power 12 PHENIX modules Mega-Pacs 4 mainframes 1.4 Install the FVTX LV Distribution Crates (being tested at LANL) 2 VME crates/20 distribution boards/2 controllers 1.5 PHENIX distr to FVTX LV distr 200 wires/ 5-pair per FVTX LV distr 1.6 Install the LV wedge fanout boards 10 boards/80 20-pin Molex input connectors, 96-16 pin Molex output connectors 1.7 FVTX distr to LV wedge fanout boards 80 (22AWGx20)/ 8 per fanout board 1.8 ROC terminal block fanout strips 24 1.9 Install the FVTX Bias Voltage Distribution crates 1 VME crate/10 distribution boards/1 controller MPOD crate

  2. Task 2.0 Make-up, test, and install cables, Bridge-racks to FVTX (~35 ft) 2.1 wedge LV cables 96 (22AWGx16)/4 per ROC 2.2 ROC LV cables 24 (??AWGx24)/ 1 per ROC 2.3 wedge bias cables 384 (16-pair, AWG22, shielded, transition to MMCX plug)/ 16 per ROC 2.4 clock power cables 4 Task 3.0 Assemble, pull fibers FEM/FEM interface to FVTX 3.1 Data Fibers 1152 fibers-16 cables (72/cable – 6 connectors/ 1.5 per ROC) 3.2 Slow Control Fibers 48 fibers-24 cables (2/cable – 1 per ROC)* 3.3 Clock Fibers 8 fibers – 4 cables (2/cable – 2/distribution board)* * SC and Clk will share the same trunk

  3. Proposed Resources • Parts ordering – Steve Boose , with help from Eric Mannel • Fanoutboard assembly- Sal Polizzo • Rack assembly- Frank Toldo • Cable connector termination- Frank Toldo, Sal Polizzo, and external vendor with oversight by Steve Boose and Eric Mannel • Terminal block termination- Frank Toldo, with oversight by Paul Giannotti with help from Eric Mannel