Bus Program Operating Costs

Bus Program Operating Costs TRANSPORTATION POLICY COMMITTEE July 2, 2003 Overview Handout #1 “Transit Operating Costs” Operating environment Bus/DAR operations funding components Cost components/allocations Capital Costs Handout #2 “Performance Management Analysis System”

Audrey
Télécharger la présentation

Bus Program Operating Costs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bus Program Operating Costs TRANSPORTATION POLICY COMMITTEE July 2, 2003

  2. Overview Handout #1 “Transit Operating Costs” • Operating environment • Bus/DAR operations funding components • Cost components/allocations • Capital Costs Handout #2 “Performance Management Analysis System” • Valley Metro system performance FY2002

  3. Valley Metro Service(Handout #1) • Predominately “contracted” environment • Bus service is provided by 5 different entities under the umbrella of the Valley Metro identity • Bus service provides over 50 million trips and more than 30 million miles of service annually • DAR service is offered by 9 different entities • DAR services provides 1 million trips annually • Bus and DAR service cost components are similar

  4. Valley Metro Service Funding($Millions)(2002) Operations • RARF: $ 5.4 • City General Funds $29.3 • Dedicated Sales Taxes $49.5 • LTAF $13.9 • Farebox $27.6 • Other $ 7.6 Total $133.3

  5. Gross Op. Net Op. Farebox Rev. CostsCosts / % Bus $106.2$ 81.8$24.4 / 23.0% Circ/Shut $3.6 / .3% DAR $ 21.5 $20.3$ 1.3 / 6.0% Van Pool $ 2.0 $ 1.9 $ .1 /96.4% Service Costs($Millions)(2002)

  6. Cost Components • Labor: Includes all driver, mechanic, supervisor, management (no city or agency staff is included) • Benefits: All insurance, worker’s comp, vacation, holidays, retirement, other benefits offered • Outside Services: subcontracted services, including some maintenance repair • Fuel/Parts/Supplies: All vehicle fuel for revenue/non-revenue vehicles, and vehicle repair parts and supplies. • Utilities: Electricity, water, gas, other misc. utility charges

  7. Cost Components (Cont.) • Insurance: Liability, property damage, other insurance coverage • Licensing/Taxes: Licensing and fees for non-revenue vehicles supplied by the contractor, property and other taxes • Miscellaneous Expense: Travel, amortized startup expenses, other misc. • Equipment/Rentals/Leases: Facilities, equipment, and other related items • Allocations/Profit: Corporate allocations and profits, where appropriate (no city or agency allocations are included)

  8. Operating Cost %’s Category% • Labor: 50.6 • Benefits: 22.5 • Outside Services: 2.1 • Fuel/Parts/Supplies: 15.1 • Utilities: 1.2 • Insurance: 2.5 • Licensing/Taxes: 0.3 • Miscellaneous Expense: 1.1 • Equipment/Rentals/Leases: 2.0 • Allocations/Profit: 2.5

  9. Capital Funds • Formula funds (FTA Section 5307) -- 17% or 20% match. Rolling stock, associated capital maintenance, capital cost of contracting, maintenance of existing facilities, and other capital purchases. • Discretionary funds (FTA Section 5309) - usually 50%-50% match. Competitive, requested at higher local matching levels, facilities construction, buses, LRT. • Congestion Mitigation and Air Quality (CMAQ) and Surface Transportation Program (STP) flexible funds -- 5.7%, and/or 0%. Rolling stock, Park-n-Rides, and LRT design/ administration are typically funded in this program.

  10. M/O-Capital Split M/O $Capital $ • Local/Regional Bus Ops 74% 26% • BRT 61% 39% • Dial-a-Ride 74% 26% • LRT 27% 73%

  11. Performance Management Analysis System(Handout #2) • System Summary • Fixed Route • Shuttle/Circulator • Dial-a-Ride • Van Pool • Operating and Capital Components • Ratings • Effectiveness • Efficiency

  12. Jim Dickey, Deputy Executive Director Valley Metro/RPTA jdickey@valleymetro.org Phone: (602) 495 0585 ForMore Information: