An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. HEC-ResSimEnhancements Better Tools to Simulate the Operation of California Reservoirs Joan Klipsch CWEMF Annual Meeting February 2007

  2. Outline • HEC-ResSim Basics • Development Objectives • The System Schematic • Rule-Base Operations Definition • New Features in Version 3.0 • The Yuba-Feather F-CO Study • Participants • Objective • MOA • Requested Enhancements for Version 3.1

  3. ResSim Development Goals • Represent the physical system as realistically as possible. • Reproduce the decision making process that reservoir operators use to set releases. • Support Multi-Purpose Operation Schemes • Represent both Flood Control Constraints & Conservation Goals • Support low flow & drought operation • Support environmental restoration investigations

  4. The Physical System • Graphical System Schematic • Reservoirs • Reaches • Junctions • Diversions • Diverted Outlets • Hierarchical Multiple Outlet Structure • Controlled and Uncontrolled Outlets • Power Plants • Pumps • Outlet Groups

  5. System Schematic

  6. Rule-Based Reservoir Operations • Guide-Curve • The seasonally-variable Desired Pool Elevation • Basic Guide Curve Operation: “Release or store to get back to guide curve.” • Zones • Zones partition reservoir storage among different purposes. • A prioritized set of rules within each zone limits or overrides basic guide curve operation.

  7. Rule-Based Reservoir Operations • Rules A rule is an objective for, or constraint on, the operation of a reservoir or system of reservoirs. Rule Types: • Flexible Local & Downstream Flow Objectives • Release or Pool Elevation Rates of Change • Emergency Gate Regulation & Induced Surcharge • Local and System Hydropower Requirements • Tandem Operation • Pump-back Schedule • User-scripted rules

  8. Zone-Based Prioritized Rule Set

  9. Allowable range of releases (cfs) 15,000 1 2 3 10,000 0: Physical Capacity 1: IROC - 3000 cfs 2: Max Release - 10,000 cfs 3: Min Release – 700 cfs Allowable Range: 700-8000 cfs 5,000 0 Basic Decision Logic • Determine the… Allowable Range of Releases • Physical Capacity defines the initial range • Rules narrow the range • Determine the… Desired Guide Curve Release • How much the reservoir should store or release to get back to guide curve in this timestep

  10. Basic Decision Logic, Cont’d. • Decide ! ? Is the Desired Guide-Curve release within the allowable range? Yes Make the Desired GC release No Make the allowable release that is closest to the Desired GC release.

  11. Other Important Operations Features • Tandem and Parallel System Operations • With variable storage balancing definition • Conditional (If-then-else) Rule Activation • Release Allocation – Outlet Prioritization • User Scripted Rules & State Variables • Outlet Outages & Capacity Overrides

  12. Tandem & Parallel System Operations • Tandem • El Vado to Abiquiu • Abiquiu to Cochiti • Parallel • Cochiti & Jemez

  13. System Balance Definition

  14. Conditional Rule Use Atwood & Leesville “watch” Dover – Not true Tandem

  15. Conditional Rule UseIf-then-else blocks

  16. Release Allocation • To provide control over how the releases are allocated to the available outlets • Two methods • Balanced • Even Balance (default) • Un-even Balance – e.g. 60-40 split • Sequential

  17. Storage Integration Scheme • Solution to the problem that occurs when a reservoir has: • Small storage • Large outlet capacity • More inflow than can be stored during a time-step

  18. Trials • Simulation ‘copies’ of an alternative • Provides extended “what-if” analysis

  19. New Development – FY07 • R&D Funded • Routing Enhancement for Downstream Ops • Tailwater-Dependent Outlet Capacity • Technical Reference Manual • Project Funded • LCRA • Projected Pool Operation • Yuba-Feather F-CO Study…

  20. Forecast-Coordinated Operations • Yuba-Feather Watershed • Oroville - Operated by CA DWR • New Bullards Bar - Operated by Yuba County Water Agency • Study Objectives • Develop a way to coordinate flood control releases from the two reservoirs, at the same time maintaining channel flow at or below the channel capacity at Marysville

  21. Forecast-Coordinated Operations • Study Team • Yuba County Water Agency • California Dept. of Water Resources • NWS CA-NV River Forecasting Center • Advisory: Sacramento District, USACE • Funding • (new) Prop 13 Grant

  22. Yuba-Feather F-CO • SPK Water Management was consulted on existing models for the basin. • Study team chose ResSim for the operations modeling tool. • SPK & Study Team identified some modifications that would be needed to effectively represent the watershed.

  23. Identified Enhancements • Phase 1 • Downstream operation must respect rate-of-change constraints • Improve Induced Surcharge operation algorithm to remove oscillations • Induced Surcharge function inadequate to represent ESRD operations. • Provide option to enter ESRD curves directly • Add a “Hold the Gate” option for falling pool operation

  24. Identified Enhancements • Phase 1, cont’d. • Add a variable contingency factor to the downstream control rule to represent uncertainty in the inflow forecast • Add a inflow factor editor to facilitate development of “what-if” inflow scenarios • Phase 2 • Add ensemble management to alternative development • Add ability to impact operations based on probability…

  25. MOA with HEC • Yuba County Water Agency • 1+ year in development • Effort failed over liability issues • NWS • 3-6 months in development • Success!

  26. Additional Requirements • NWS-RFS integration • Hot-start Feature • Headless Operation • Port to Linux

  27. Downstream Ops & Rate-of-Change - Current

  28. Downstream Ops & Rate-of-Change - New

  29. New - Contingency Factor • Effective space at the downstream control location is computed as the difference between the downstream limit modified by the contingency percentage and the cumulative local flow. • For a downstream maximum flow rule, the downstream limit is multiplied by (1 – contingency percentage/100), resulting in a reduced maximum limit.

  30. Contingency Factor

  31. New - Inflow Multipliers

  32. Hydrologic Engineering Center More Info… • Version 3.0, Release March 2007 !!! • HEC’s Web Site: www.hec.usace.army.mil • HEC’s ResSim Point of Contact: Joan D. Klipsch