GAL Power highlights the work we conducted to temporarily dry a 3,000 square-foot warehouse that experienced a water line explosion, which led to buckled concrete and flooding. It happened right before Christmas, which is the busiest time of year for the client due to many retail orders for their high-end product. <br>To preserve the moisture-sensitive product as fast as possible and order loss from major retailers, we mobilized and reached the site within 4 hours. Around 90% of the equipment required for the operation arriving shortly after. We provided six 5,000 CFM and one 15,000 CFM desiccant dehumidifiers, as well as four Air2Go fans and twelve barrel fans for proper drying and circulation. Additional power was provided by 1,250 kw, 140 kw, 125 kw and 50 kw generators, as well as 24 spider boxes and various distribution panels. <br>Our client was 100% operational after 7 days of intense drying. During this time period, our GAL specialists were on-site for monitoring and optimization of the drying process. Damage to the water-sensitive inventory was mitigated to less than 5 skids of product, and our client was thrilled with the results and response time we provided with our expertise. <br>To learn more about our GAL Power customized power solutions, services, and more, please visit http://www.galpower.com/en/.<br>Connect us:<br>http://www.facebook.com/galpowersystems<br>http://twitter.com/galpowersystems<br>http://www.linkedin.com/company/gal-power-systems<br>

Galpower2
Télécharger la présentation

A Case Study of Temporarily Drying a Warehouse - GAL Power

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Profiles CASE STUDY TEMPORARY DRYING LARGE WAREHOUSE GAL Power Systems EVENT POWER & CLIMATE CONTROL SPECIALISTS Knowledge is Power…. Never be Powerless

  2. OUR VISION ‘Our Vision is to be Canada’s foremost customer centric power generator services and climate control Company, where the highest quality of service is delivered every time at the best value.’

  3. SCOPE OF WORK – TEMPORARY DRYING LARGE WAREHOUSE • A water main exploded under a 300,000 square foot warehouse, buckling the concrete and flooding the warehouse. • This occurred at the busiest time of the year for the client, right before Christmas, as they were trying to fill orders of their high end product for major retailers. Knowledge is Power…. Never be Powerless

  4. CHALLENGES • It was a large building and the busiest time of the year so the client needed to be up and running quickly or they would lose potential orders from their major retailers. • The high-end product contained in the warehouse was also moisture sensitive, so the drying time was critical as product could be ruined. Knowledge is Power…. Never be Powerless

  5. SOLUTION • GAL was mobilized and on site within 4 hours with 90% of the equipment required with the balance arriving shortly thereafter. • We provided 6- 5,000 CFM and 1- 15,000 CFM Desiccant Dehumidifiers as well as 4- Air2Go fans and 12- Barrel Fans for drying and circulation. • Additional power was provided with a 1,250 kw, 140 kw, 125 kw and a 50kw generator along with 24 spider boxes and various distribution panels. • 3,000 feet of ducting was run throughout the warehouse to ensure even and maximum efficiency drying • GAL specialists were on site for 7 days and monitored the site to ensure the drying process was optimized. Knowledge is Power…. Never be Powerless

  6. HERE’S WHY WE HAVE ANOTHER SATISFIED CUSTOMER After a major flooding issue in their warehouse, our client was 100% operational after 7 days of intense drying. Damage to water sensitive inventory product was mitigated to less than 5 skids of product. The client was thrilled with our disaster response time and expertise. They were amazed that their business was back up and running in a week! Knowledge is Power…. Never be Powerless

  7. For more information about how GAL Power can make your project a success, visit us at www.galpower.com or call us at 1-866-425-7368