Case Study_AMPAM Studio

DESCRIPTION

Excelize project success story a high effective, time saving and working with flexibe team. The Resident project is ongoing in US.

Télécharger la présentation

Case Study_AMPAM Studio

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT SUCCESS STORY California, USA Residential projects with an average area of 20000 square meters. Highly cost-effective | Time-saving | Flexible team

  2. PROJECT STATUS MULTIPLE- ONGOING About the project: The Studio specializes in designing and creating construction documents for both residential and commercial properties Input: fig 1:- Riser Diagram fig 2:-Floor plans Scope of work: Quantity take-off The Scope includes plumbing schematic design, design development, and clash coordination It also includes preparing construction documents such as Shop drawings, Spool drawings, and fabrication drawings LOD 300 Clashes Detection & Resolution Construction documents www.excelize.com

  3. Challenges: Benefit to the client: The client is unable to place an order for bulk material as the quantity of material required is uncertain The client does not have a solution in case of any urgent task The client was unable to save time on-site due to traditional plumbing installation methods We provide an exact quantity of bulk material in the form of Fabrication sheets to order on-site making it cost-effective The work is divided among the Studio team in case of urgent tasks and hence the time required to successfully construct a building is drastically reduced Due to the presence of a studio team, work is being constantly progressed with minimal supervision around the clock 1 2 3 Output: fig 1:- Riser Diagram fig 2:-Floor plans Our Services: BIM Consulting Scan to BIM Shop Drawings Architectural BIM MEP coordination Landscape BIM BIM training Model auditing BIM studio www.excelize.com

  4. 20+ years of BIM leadership 2500+ projects ISO 19650 Certified 100+ companies prefer Excelize as BIM partner 3 global offices and capability centers marketing@excelize.com | www.excelize.com