Case Study Prefabricated Custom Home

DESCRIPTION

Excelize project success story with cost saving and future responsibility. the project is ongoing in the USA.

Télécharger la présentation

Case Study Prefabricated Custom Home

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PROJECT SUCCESS STORY Hackettstown, NJ 07840, USA This is a prefabricated type of house no. 1 with an area of 14000 sq. ft. More types of house projects may come Cost Savings | Future Replicability

  2. PROJECT STATUS ONGOING About the project: This is a 3BHK prefabricated type of residential home modeled as per the client's input and instructions. This includes architecture, structure & a couple of the plumbing, kitchen & electrical elements Input: Conceptual 3D view and detailed 2D drawings A/SK-01 A/SK-01 B/SK-01 STRAP PER D/SK-01 A/SK-01 A/SK-01 C/SK-01 Scope of work: Model plumbing layouts The Scope includes architecture, structure & MEP modeling, clash coordination It also includes preparing shop drawings & BOM at LOD 400 Also providing walkthrough and rendered images as required fig 3:- Model plumbing layouts for all the fixtures in the house with material schedule LOD 300 Clashes Detection & Resolution Construction documents www.excelize.com

  3. Challenges: Benefit to the client: Precision Requirement: Ensuring accuracy down to the nail level demands meticulous attention Integration of Panels: Seamless integration of prefabricated panels requires close coordination Data Management: Managing large volumes of BIM data necessitates robust data management systems Enhanced Collaboration: BIM streamlines collaboration among stakeholders, improving project coordination Clash Detection: Early identification of clashes reduces on-site conflicts and rework Defect Identification: Detailed modeling helps identify and rectify defects before construction Accurate Bill of Quantities: BIM provides precise cost estimates, including nail quantities Standardization: Prefabricated panels ensure consistent quality and enable easy replication of designs 1 2 3 Output: fig 5:- 3D gable roof fig 4:-Provide exact assembly sequence of panels for 4D Our Services: BIM Consulting Scan to BIM Shop Drawings Architectural BIM MEP coordination Landscape BIM BIM training Model auditing BIM studio www.excelize.com

  4. 20+ years of BIM leadership 2500+ projects ISO 19650 Certified 100+ companies prefer Excelize as BIM partner 3 global offices and capability centers marketing@excelize.com | www.excelize.com