1 / 3

Activity-Based Costing

Leo
Télécharger la présentation

Activity-Based Costing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. ???????????? ??? ???

    8. ????????????? ?? (Activity):?????????,?:

    9. ??? ??????????????????????;???????????????????????

    10. ????????

    11. ??????? ????????????????? ????????(extended value chain)? ????????,?????????? * ??????“???????(?)”?????

    12. ????????????

    13. ??????--??????

    18. ??????—?????? ????????? ????????????? ??????(major activities)?????? ????????????(future performance)????

    19. ????????

    20. ????????

    21. ??????—?????????????? Aerotech ??????????????,?????Mode I, Mode II, and Mode III. ????????????????? :

    22. ??????—?????????????? ??????:

    23. ??????—??????????????

    24. ??????—?????????????? ??????????, Aerotech ????????? (?? *125%).

    25. ??????—?????????????? Aerotech ??????ABC(activity-based costing)???,?????????.

    26. ABC?? (Activity-Based Costing System) ABC ????? ?? (two-stage) ??,????? ??????

    27. Activity-Based Costing System (ABC) ABC ????? ?? (two-stage) ??,????? ??????

    28. Activity-Based Costing System (ABC) ABC ????? ?? (two-stage) ??,????? ??????

    40. ABC????????? ??????????? :

    41. Other Overhead Costs

    42. Other Overhead Costs

    43. Product Cost from ABC These are the new product costs when Aerotech uses ABC.

    44. Product Diversity Both original and ABC target selling prices are based on (Cost ?125%).

    45. Product Diversity Can you identify any problems Aerotech is likely to face as a result of this distortion?

    46. ABC: ?????? ?? ????????????????. ??????????????. ?? ???????????????. ???????????????.

    47. ?? v.s ???? ????????? ???????? ???????, ???????? ????????. ?????????? ???????? ???????? ???.

    48. ABC????

    49. ????ABC

    50. ABC???? ?????? “???????????ABC??”

More Related