E N D
1. ????????????
??? ???
8. ????????????? ?? (Activity):?????????,?:
9. ??? ??????????????????????;???????????????????????
10. ????????
11. ??????? ?????????????????
????????(extended value chain)?
????????,??????????
* ??????“???????(?)”?????
12. ????????????
13. ??????--??????
18. ??????—??????
?????????
?????????????
??????(major activities)??????
????????????(future performance)????
19. ????????
20. ????????
21. ??????—?????????????? Aerotech ??????????????,?????Mode I, Mode II, and Mode III.
????????????????? :
22. ??????—?????????????? ??????:
23. ??????—??????????????
24. ??????—?????????????? ??????????, Aerotech ????????? (?? *125%).
25. ??????—?????????????? Aerotech ??????ABC(activity-based costing)???,?????????.
26. ABC??(Activity-Based Costing System)
ABC ?????
?? (two-stage) ??,?????
??????
27. Activity-Based Costing System (ABC) ABC ?????
?? (two-stage) ??,?????
??????
28. Activity-Based Costing System (ABC) ABC ?????
?? (two-stage) ??,?????
??????
40. ABC????????? ??????????? :
41. Other Overhead Costs
42. Other Overhead Costs
43. Product Cost from ABC These are the new product costs when Aerotech uses ABC.
44. Product Diversity Both original and ABC target selling prices are based on (Cost ?125%).
45. Product Diversity Can you identify any problems Aerotech is likely to face as a result of this distortion?
46. ABC: ?????? ??
????????????????.
??????????????. ??
???????????????.
???????????????.
47. ?? v.s ???? ?????????
????????
???????,
????????
????????. ??????????
????????
????????
???.
48. ABC????
49. ????ABC
50. ABC???? ??????
“???????????ABC??”