An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Activity Based Costing Acct 310 Professor Rick S. Hayes, Ph.D., CPA

  2. MicroMash CPE Course Example

  3. Make sure that costing done correctly, reduce costs • Direct labor and materials costs [prime costs]– easy to trace to product • Manufacturing overhead is indirect cost – hard to trace, control – estimate, calculate cost per unit

  4. Traditional Unit Based Cost (UBC) Accounting

  5. Standard costing is about assigning overhead costs based upon one predetermined rate based on volume • Easier, less accurate; Works best with one product; • Could be misleading

  6. Standard costing – steps • Accumulate total overhead costs • Identify activity and total amount of activity that best applies overhead costs to the product (base), e.g. labor hours • Calculate application base rate(total overhead/ total amount of the activity) $20,000 total oh/ 1,000 labor hrs = $20 base rate per hour worked • Apply overhead rate - Multiply base rate by total base activity used for each product. A product that takes 2 hours at $20 base rate would be allocated $40 of overhead (2 x $20)

  7. Standard Costing Method Total manufacturing overhead $10,000,000 Direct labor hours 500,000 10,000,000/50,000 = $20/labor hour application base rate $20 * 2 hours per product to mfg. = $40 overhead cost per unit Product A = manufacturing overhead cost per unit- $40 Product B = manufacturing overhead cost per unit- $40 Product A = total manufacturing cost /unit - $150 Product B = total manufacturing cost/unit - $110

  8. Standard Costing Method Standards costing example total cost per unit • A B • Direct Materials $90 $50 • Direct Labor @ $10/hr $20 $20 • Manufacturing OH $40$40 • Total per unit cost $150 $110

  9. The organization is viewed as a pool of activities. Many of these activities will cut across deparments with departments often participating in many different activities

  10. ABC costing – steps • Re-categorize overhead costs into activity pools • Calculate total costs and total physical base for each activity • Calculate application base rate for each category (total overhead/ total physical base) • Calculate proportion of physical base for each category • Multiply rate by base for each product • Calculate total overhead cost for each product • Divide total cost for each product by total products manufactured = overhead cost per unit • Add overhead cost per unit to direct labor cost per unit and direct material cost per unit = total cost per unit

  11. Activity Based Costing • Two stage allocation process • Assign costs to pools, then assign to products using cost drivers • I.e. Sell 50,000 units – Product A, 200,000 units – Product B = 250,000 units total • Both require two direct labor hours to complete = 500,000 direct labor-hours • Total manufacturing overhead = $10,000,000

  12. ABC Costing

  13. Product A - manufacturing overhead costs = $93.20 Product B - manufacturing overhead costs = $26.70

  14. A B Direct Materials $90 $50 Direct Labor @ $10/hr $20 $20 Manufacturing OH $93.20 $26.70 Total per unit cost $203.20 $96.70

  15. QUESTIONS?

  16. ABC Hierarchical Production Model

  17. Facility Support Activities not ABC