Work Planning & Control

Work Planning & Control. Process Overview Dept Heads December 08 . Agenda. WPC Objective Work Planning & Control (WPC) process introduction What will a WPC do? What is changing? Authorization Release to Proceed Work Package Elements Next Steps Q&A. WPC Objective.

Renfred
Télécharger la présentation

Work Planning & Control

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Work Planning & Control Process Overview Dept Heads December 08

  2. Agenda • WPC Objective • Work Planning & Control (WPC) process introduction • What will a WPC do? • What is changing? • Authorization • Release to Proceed • Work Package Elements • Next Steps • Q&A

  3. WPC Objective • Support SLAC mission with implementation of a productive WPC process that enables safe work by: • Capturing complete scope of work • Supporting identification & analysis of hazards • Identifying controls; permits, plans, surveys, etc. • Authorizing work by accountable representatives • Improving communication of hazards & controls to affected workers • Providing a mechanism for worker feedback, both as lessons learned and process improvements

  4. What will a WPC process do? • Provide a framework to authorize and release all work, consistent with good practices and ISEMS principles • Provide guidance to document the planning, authorization and release of all work • Establish accountability

  5. What is changing? • Eliminate JHAM for office-type work • Replace JHAM with ATA for non-office work • ATA – Activity & Training Authorization • Exclude office-type tasks from ATA • Replace non-routine JHAM with JSA or procedure • JSA – Job Safety Analysis

  6. What is changing? • Describing work • Green – office-type work • Yellow • Outside your resident work area – dispatch • In your resident work area • Red – complex work • Multiple work groups/trades involved • Two or more permits or plans are required

  7. What is changing? • How work is authorized • Work is authorized by a supervisor with • ATA signed by the employee and their supervisor, or • JSA or procedure signed by the employee & supervisor • Some work must be Released to Proceed • Dispatch work & complex work • Granted by Bldg Mgr, Area Mgr or PM/PI

  8. Authorization • All work is authorized • All work is authorized by a supervisor • All non-green work is authorized with a signed: • ATA for work in the resident work area, or • JSA or procedure for work outside the resident work area

  9. Release to Proceed • Green work does not require a Release • Yellow work performed • outside resident work area requires a Release • in resident work area does not require a Release • Red work requires a Release

  10. Work Package Elements • FAMIS, Visual, Cator, work order (Scope) • Signed JSA or procedure (Documents Hazards & Controls, & Authorizes work) • Permit(s), if required • Release to Proceed • Other info (emails, notes, etc)

  11. Next steps • Reinforce line management accountability • Appoint WPC “liaisons” • Deliver training per Directorate strategy • Support line management as a resource • Complete training by 3/31/09 • Create a supportive environment to question performance and drive improvement • Include WPC in R2A2 • Transition to Activity & Training Authorization (ATA) from JHAM (eliminating JHAMs) • Non-office work only (No ATA for office workers) • By end of 2009 performance review cycle

  12. Questions

  13. Extra info

  14. Green Work Description • Office-type activities • Activities commonly performed by the public, posing well-known hazards, with controls that may be implemented without permits or special training • Examples include • Driving, walking, cycling on campus • Using janitorial or office supplies • Using lab equipment (calipers, microscope) in the absence of hazardous materials • Routine operation & service of office equipment

  15. Yellow Examples • Align 3B lasers • Machining in your resident area/building • One time machining of Be in your resident area/bldg • Regular building maintenance • Use of a forklift to move supplies • Bolt a piece of equipment to the floor • Move a Bridgeport mill from one area to another • Operate hydrogen furnace • Perform plating shop operations

  16. Red Work Examples • BaBar D&D • Repair Q38 magnet in BSY • Install BC2 shielding support • Build Muon shield