1 / 5

DTW SNOW STUDY

DTW SNOW STUDY. PLANNING FOR THE FUTURE. DTW SNOW STUDY. What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events?

Sophia
Télécharger la présentation

DTW SNOW STUDY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. DTW SNOW STUDY PLANNING FOR THE FUTURE

  2. DTW SNOW STUDY • What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events? • Today’s economy demands that all facets of the aviation industry develop a collaborative approach to safely maximizing opportunities.

  3. DTW SNOW STUDY • THE PLANS: • EQUIPMENT • MANPOWER • FACILITIES • OPERATIONS • FINANCIAL

  4. EQUIPMENT PLAN • RUNWAY TEAM 11 High Speed Multi-Function Plows 6 High Speed Large Capacity Blowers 2 Conventional Runway Plows 3 Sand Trucks 2 De-icer Tankers TOTAL RUNWAY EQUIPMENT: 24 Pieces • TAXIWAY TEAM 4 High Speed Multi-Function Plows 4 High Speed Large Capacity Blowers 4 Conventional Runway Plows or Brooms 2 Sand Trucks 1 De-icer Tanker TOTAL TAXIWAY EQUIPMENT: 15 Pieces • TOTAL EQUIPMENT NEEDED: 39 Pieces

More Related