50 likes | 415 Vues
DTW SNOW STUDY. PLANNING FOR THE FUTURE. DTW SNOW STUDY. What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events?
E N D
DTW SNOW STUDY PLANNING FOR THE FUTURE
DTW SNOW STUDY • What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events? • Today’s economy demands that all facets of the aviation industry develop a collaborative approach to safely maximizing opportunities.
DTW SNOW STUDY • THE PLANS: • EQUIPMENT • MANPOWER • FACILITIES • OPERATIONS • FINANCIAL
EQUIPMENT PLAN • RUNWAY TEAM 11 High Speed Multi-Function Plows 6 High Speed Large Capacity Blowers 2 Conventional Runway Plows 3 Sand Trucks 2 De-icer Tankers TOTAL RUNWAY EQUIPMENT: 24 Pieces • TAXIWAY TEAM 4 High Speed Multi-Function Plows 4 High Speed Large Capacity Blowers 4 Conventional Runway Plows or Brooms 2 Sand Trucks 1 De-icer Tanker TOTAL TAXIWAY EQUIPMENT: 15 Pieces • TOTAL EQUIPMENT NEEDED: 39 Pieces