DTW SNOW STUDY
50 likes | 433 Vues
DTW SNOW STUDY. PLANNING FOR THE FUTURE. DTW SNOW STUDY. What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events?
DTW SNOW STUDY
E N D
Presentation Transcript
DTW SNOW STUDY PLANNING FOR THE FUTURE
DTW SNOW STUDY • What snow removal resources are needed to safely operate DTW’s airfield, allowing for optimal capacity during snow events? • Today’s economy demands that all facets of the aviation industry develop a collaborative approach to safely maximizing opportunities.
DTW SNOW STUDY • THE PLANS: • EQUIPMENT • MANPOWER • FACILITIES • OPERATIONS • FINANCIAL
EQUIPMENT PLAN • RUNWAY TEAM 11 High Speed Multi-Function Plows 6 High Speed Large Capacity Blowers 2 Conventional Runway Plows 3 Sand Trucks 2 De-icer Tankers TOTAL RUNWAY EQUIPMENT: 24 Pieces • TAXIWAY TEAM 4 High Speed Multi-Function Plows 4 High Speed Large Capacity Blowers 4 Conventional Runway Plows or Brooms 2 Sand Trucks 1 De-icer Tanker TOTAL TAXIWAY EQUIPMENT: 15 Pieces • TOTAL EQUIPMENT NEEDED: 39 Pieces