Risk-Based Management of Hurricane Preparedness and Recovery for a Highway Agency

Risk-Based Management of Hurricane Preparedness and Recovery for a Highway Agency. Presented to the Virginia Department of Transportation Steering Committee by the Center for Risk Management of Engineering Systems March 19, 2000. VDOT Steering Committee.

Sophia
Télécharger la présentation

Risk-Based Management of Hurricane Preparedness and Recovery for a Highway Agency

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Risk-Based Management of Hurricane Preparedness and Recovery for a Highway Agency Presented to the Virginia Department of Transportation Steering Committee by the Center for Risk Management of Engineering Systems March 19, 2000

  2. VDOT Steering Committee Virginia Department of Transportation Travis Bridewell Mac Clarke Perry Cogburn Jon DuFresne Stephany Hanshaw Steve Mondul Murali Rao Bob Rasmussen J.R. Robinson Gerald Venable Virginia Transportation Research Council Wayne Ferguson

  3. Newport News Police Virginia Beach Police Norfolk Police Franklin Police Chester Police OBICI Hospital Red Cross Norfolk Emergency Operations Center Virginia Department of Emergency Services Virginia State Police VDOT Traffic Engineering VDOT ITS Sentara Hospitals Virginia Beach Fire Virginia Beach Office of Emergency Management Virginia Port Authority Virginia Department of Rail and Public Transportation Stakeholders

  4. University of Virginia Graduate Student Richard D. Moutoux Undergraduate Students Ryan M. Finseth Linn H. Koo Clare E. Patterson Timothy J. Zitkevitz Faculty James H. Lambert, Research Assistant Professor of Systems Engineering Yacov Y. Haimes, Quarles Professor of Systems and Civil Engineering Garrick E. Louis, Assistant Professor of Systems Engineering Project website: http://www.virginia.edu/~risk/recovery

  5. Progress Reviews • Stakeholders workshop – February 28, 2000 • Hampton Roads Planning District Commission (HRPDC) – April 5, 2000 • Virginia Department of Emergency Management (VDEM) – October 6, 2000 • Steering committee – December 2, 1999 and December 12, 2000

  6. Overview of Presentation • Introduction • Overview of approach • Risk-based prioritization of recovery • Decision support for resource allocation • Agency coordination of recovery schedule • Trade-off analysis of recovery and preparedness alternatives • Equipment enhancement • Use of hurricane forecasts

  7. Motivation • Restore mobility as quickly as possible • Currently no formal highway recovery methodology exists • Justify aid from FEMA and FHWA • Potential for $30-60 billion in losses for a category IV hitting Tidewater, Richmond, or Northern Virginia (Source: Post Hurricane Recovery Workshop, Insurance Institute, 1997)

  8. Saffir-Simpson Hurricane Categories

  9. U.S. Mainland Hurricane Strikes 1900-1996 (NHC, 1999)

  10. Hurricane Floyd • Hurricane Floyd hit Suffolk District in mid-September, causing significant flood damage • 56 deaths made Floyd the deadliest US hurricane since Agnes in 1972 • Roads did not receive much wind damage, but flooding closed many roads in Virginia

  11. Hurricane Floyd (cont.)

  12. Project Goal The goal of the effort is to improve hurricane preparedness and recovery of the Virginia Department of Transportation through the identification of planning and management options and the assessment and evaluation of the associated costs, benefits, and risks

  13. Task 1: Review of Literature and Formation of Advisory Committees • Review and evaluation of past studies, theory and methodology, other agencies' experience, and databases • Two advisory committees: (1) Steering Committee, consisting primarily of VDOT personnel; and (2) a Users' Group, made up of localities and other government agencies, e.g., emergency services.

  14. Task 2. Extension of Prioritization Tool to GIS Platform • Integrate the mapping of critical facilities with VDOT's capabilities for geographic information system (GIS) • Work closely with the Transportation Information Management Steering Committee (TIMSC) and current managers of VDOT information systems, including GIS, to ensure compatibility.

  15. Task 3. Incorporation of Localities and Additional Critical Facilities • Local jurisdictions • Intermodal connections (ports, airports, rail) • Number of people served • Logistic points (e.g., food warehouses, power generation facilities, water bottling plants, natural gas pipeline heads, collection and distribution points).

  16. Task 4. Use of Hurricane Forecasts for VDOT Operations • National Hurricane Center and others • The effort will demonstrate the efficacy of probabilistic hurricane forecasts in support of various VDOT planning and management functions. • Capture the impacts of current decisions to future options

  17. Task 5. Modeling for Agency-Wide Preparedness and Recovery • Hierarchical holographic modeling (HHM) will be used to classify overlapping and connected functions, divisions, and performance metrics • Similar studies for the DoD, FBI, and PCCIP • Foundation for resource allocation and coordination within and outside agency

  18. Task 6. Resources, Databases, and SoftwareTask 7. Reports, Presentations, and Workshop

  19. Overview of Approach

  20. HHM for Preparedness

  21. Abbreviated HHM

  22. Organizational HHM

  23. Sample Trade-Off Analysis

  24. Trade-Off Analysis (cont.) Option3 Option2 Option1 Status Quo

  25. Risk-Based Prioritization of Recovery

  26. Features of Priority Setting • Importance of roads and intersections based on critical facilities and condition of road network • Restoring or replacing damaged equipment • Critical facilities are those necessary for a community’s well-being

  27. Classification of Critical Facilities

  28. Critical Facilities

  29. Geographic Information Systems • Build on an existing GIS database of VDOT roads • Network modeling used to create prioritization tool • Using Microsoft Excel for optimization and user functionality

  30. Electronic Road Map • Two sources for electronic road maps • VDOT’s “Network Level Basemap” • Used to establish road system from which network model will be created • Census maps obtained from UVA Library • Used for geocoding addresses

  31. Suffolk District Eastern Shore Williamsburg Hampton Roads Emporia Example of Arcview Map

  32. Facility Data Acquisition • Worked with the Hampton Roads Planning District Commission to get data on locations of critical facilities • Facility data also collected by geocoding addresses in Arcview • Critical facilities stored by category and sub-category

  33. Norfolk Roads and Facilities

  34. Data Summary • Data gathered includes critical facilities, population, highway mileage, and connections • Data is imported into Excel using a grid system • Data is used to create a prioritization model in Excel

  35. Excel Grid Method • Microsoft Excel is used for the prioritization model • A map is in the background of a spreadsheet for spatial reference • In addition to being much easier for VDOT to use, the spreadsheet format makes modeling straightforward

  36. Sample Excel Grid Method

  37. Arcview Grid

  38. Prioritization in Excel • Spreadsheet layers contain facilities, road mileage, population, etc. • Priority metrics are calculated across the grid • Priorities are reflected by color-coding grid elements

  39. Sample Categorical Prioritization

  40. Decision Criteria • The following types of data can be used for spreadsheet prioritization: • Population • Roadway mileage by road type (Interstate, US highway, or primary route) – three different measurements • Critical facilities by category (eight categories) • All combinations are possible

  41. Operating the Prioritization Tool • All that is required is an entry of one or zero in each box of this table • A one includes that category in the calculation • This example does not break down the road types or the many categories of facilities

  42. Prioritization Tool Example

  43. Prioritization Example (cont.)

  44. Calibration of Tool

  45. Local and Region-wide Models

  46. Sensitivity Analysis

  47. Temporal Priorities • The model will prioritize recovery differently based on short, medium, and long-term goals • Certain facilities are most important immediately after a disaster, and others are needed further down the road • Since the Excel model includes data for all categories of facilities, roads, and population, these changes will be simple to implement

  48. Phases of Preparedness …. …. ….

  49. Decision Support for Resource Allocation

  50. Motivation • Hurricane Floyd struck Virginia in September 1999 and resulted in severe damage from flooding • Over 100,000 phone calls to Emergency Operations Center as a result • Large scale of disaster makes it difficult to appreciate where the resources are going