1 / 3

Green Belt Projects Explained: A Relevant Example for Better Comprehension

To truly demystify a Six Sigma Green Belt project, it helps to move away from abstract math and look at a practical, "boots-on-the-ground" scenario. A Green Belt project is typically a medium-scope initiativeu2014meaning itu2019s larger than a quick fix but smaller than a total company overhaul.

Tharun12
Télécharger la présentation

Green Belt Projects Explained: A Relevant Example for Better Comprehension

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Green Belt Projects Explained: A Relevant Example for Better Comprehension To truly demystify a Six Sigma Green Belt project, it helps to move away from abstract math and look at a practical, "boots-on-the-ground" scenario. A Green Belt project is typically a medium-scope initiative—meaning it’s larger than a quick fix but smaller than a total company overhaul.

  2. Below is an example based on a common business challenge: Reducing "Lead Time" in a Recruitment Process. The Problem: Talent is Slipping Away A mid-sized tech company noticed they were losing top-tier job candidates to competitors. The internal data showed the hiring process took an average of 45 days, while the industry standard was 25 days. Phase 1: Define – Scoping the Investigation The Green Belt begins by creating a Project Charter to ensure everyone agrees on the goal. They use a SIPOC (Suppliers, Inputs, Process, Outputs, Customers) diagram to map the high-level boundaries of the "Hire to Onboard" process. Problem Statement: The current hiring cycle takes 45 days, resulting in a 30% candidate withdrawal rate. Goal: Reduce the average hiring time to 25 days within 4 months. Phase 2: Measure – Establishing the Baseline The Green Belt doesn't just guess which step is slow; they collect data on the last 50 hires. Data Collection: They track the time spent in each "bucket": Screening, Interviewing, Testing, and Offer. Process Capability: They calculate the current "Sigma level" of the process to show how far they are from meeting the 25-day requirement consistently. Phase 3: Analyze – Identifying the Root Causes Using a Fishbone (Ishikawa) Diagram, the team brainstorms why the process is lagging. They look at categories like "Methods" (outdated interview scripts) and "Manpower" (hiring manager availability). By applying a Pareto Chart, the data reveals that 75% of the delays occur during the "Hiring Manager Feedback" stage—it takes an average of 10 days just to get an interview score back. Phase 4: Improve – Designing the Solution Instead of just "telling people to be faster," the Green Belt implements a structural change: Lean Integration: They eliminated the "Non-Value Added" step of a second HR screening that was redundant. Poka-Yoke (Error Proofing): They implement an automated scheduling tool that requires managers to block out "Interview Slots" at the start of the week. If feedback isn't entered within 24 hours, the system sends an automated escalation to the Department Head. Phase 5: Control – Sustaining the Results To ensure the process doesn't slip back to 45 days, the Green Belt uses a Control Chart. Monitoring: Every week, the average "Time to Hire" is plotted.

  3. Intervention: If a data point exceeds the Upper Control Limit (UCL), the HR team immediately investigates the specific bottleneck before it becomes the new "normal."

More Related