1 / 33

Streamlining, technical aspects

Streamlining, technical aspects. Marton Vucsan, Sharing Advisory Board. Contents. Introduction Top down or bottom up? An architecture for cooperation An infrastructure for cooperation Sharing of (?). Introduction. IT is growing up Internet in 1992 was virtually non-existent,

Thomas
Télécharger la présentation

Streamlining, technical aspects

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Streamlining, technical aspects • Marton Vucsan, Sharing Advisory Board

  2. Contents • Introduction • Top down or bottom up? • An architecture for cooperation • An infrastructure for cooperation • Sharing of (?)

  3. Introduction • IT is growing up • Internet in 1992 was virtually non-existent, • Industrialisation not à la Ford, but modern • Economic Crises forces our hand

  4. We live in exponential times The internet has 1800 exabytes of data in 2011 exa = 10^18 4 IDC/EMC white paper 2008 NOW

  5. Industrialisation 1900 • Mental picture: Modern Times (Chaplin)

  6. Modern Industrialisation • Mental Picture: 3d printingDesktop factory

  7. Crisis: we must adapt • We have less resources • We must process more data with less money • We have to deliver, information is most needed

  8. Development Top Down or Bottom Up

  9. Bottom Up? • The way of the specialists • Driven by local businesscase • Tool choice: mostly what’s available • Problem definition? Perception within current mindframe • Not normally based on methodological concepts

  10. Top Down! • Driven by the Business top management • Fuelled by business goals • Guided by business architecture • Global decisions on tools • Based on methodological concepts • Enabling international cooperation

  11. An Architecture for cooperation • Shared conceptual framework • Shared Architecture (Business and IT) • GSBPM GSIM CORA • Shared technical reference architecture • CORE • Shared facilitating infrastructure • OSOR and MSIS/SAB wiki

  12. Shared Conceptual framework

  13. GSBPM (Business architecture) describes the business Business abstraction GSIM + CORA (Information Architecture) describes connection business < - > implementation IT abstraction Implementation Model (IT Architecture) describes implementation Architecture – Model -

  14. Architecture Step 1 Define the statistical process Business abstraction GSIM + CORA (Information Architecture) describes connection business < - > implementation IT abstraction Implementation Model (IT Architecture) describes implementation

  15. Statistical proces • As collection of GSBPM subprocesses

  16. Architecture Step 2 Statistical process Business abstraction Define abstract services that fulfill orchestrated tasks in hierarchical relation (process + logistics) IT abstraction Implementation Model (IT Architecture) describes implementation

  17. Abstract services As GSBPM subprocesses at CORA integration layers

  18. Architecture Step 3 Statistical process Business abstraction Define abstract statistical services that fulfill orchestrated tasks in hierarchical relation (process + logistics) IT abstraction Define and create IT services with interfaces that map to the above and implement actions defined above

  19. ESSnet Core: (service cores) Parameters Prescripts Service Core input data according to the core’s internal data model output data according to the core’s internal data model

  20. ESSnet Core:(services) • Encapsulated software • Standard interface • Integration components included parameter supplier rules data trans- former data trans- former Service Core

  21. other NSI? ESSnet Core:(process)

  22. Design time Service Cores Runtime Service Cores Design time <> Runtime 1. Specify needs 2. Design 3. Build 4. Collect 5. Process 6. Analyse 7. Disseminate 8. Archive 9. Evaluate Create

  23. Result: • Development of processes: • Modular in statistical elements • Platform and NSI independent • Statistical process as: • Desktop factory for high level statisticians • Industrial automated production lines

  24. Shared Development • Mandatory for current challenges • Resources: • Europe’s OSOR website • UNECE MSIS Wiki

  25. Osor website

  26. It’s there for you

  27. MSIS Wiki

  28. MSIS Software Inventory

  29. MSIS Software Inventory

  30. MSIS Project Brokerage

  31. MSIS SAB Newsletter

  32. MSIS Key Indicators (login)

  33. Questions?

More Related